The Project Manual, Pt. 1
The Project Manual, Pt. 2
Spec Section Types
CSI Standard 3 Part Format
Submittals
100

Divs. 00-49

What is the Project Manual?

100

These are "Documents", not Specs

What is Division 00?

100

This Spec type lists the Product Manufacturer, the Product, Product Types, Product Number, Product Color, and other relevant product information.

What are Proprietary Specifications?

100

Title of CSI Spec Section format methodology

What is 3 Part "SectionFormat" ?

100

Any required document (or item) that is submitted for review & approval

What is a Submittal?

200

Divs. 01-49

What are the Specifications?

200

These are construction contract administration processes, procedures & requirements

What is Division 01: General Requirements?

200

This Spec type is built around national, recognized reference standards like UL, INDOT, AISC, ASTM, OSHA, and many others........

What are Reference Standard Specs?

200

This is the title of Part 1

What is Part 1: General?

200

This group of Submittals includes items like Construction Bonds, Schedule of Value, Subcontractor List, Product List, and anything else required at this time

What are the Pre-Construction Submittals?

300

Divs. 02-49

What are the construction project specification Divisions?

300

This group includes the following 4 items:

1. Solicitation

2. Instructions

3. Available Information

4. Bid Form

What are the Procurement Requirements?

300

Proprietary & Reference Standard Spec types have been mentioned; name the other 2 types.

What are Descriptive Specs & Performance Specs?

300

This is the title of Part 2.

What is Part 2: Products?

300

This is when the Pre-Con Submittals are usually required to be submitted

When is at the Pre-Construction Meeting (or Pre-Con Conference)?

400

Procurement & Contracting Requirements

What is the title of Division 00?

400

This group includes the following 4 items:

1. Agreement

2. Construction Bonds

3. General Conditions

4. Contract Modifications

What are the Contracting Requirements?

400

This Spec type lists only 1 acceptable Product that must be used by ALL Bidders.

What is a "Closed" Proprietary Spec?

400

This is the title of Part 3

What is Part 3: Execution?

400

The majority of these Submittals are the actual construction project Product Submittals

What are Construction Submittals?

500

General Requirements

What is the title of Division 01?

500

Match the following with their correct title:

A101

A201

A312

A701

96

What are the following:

A101: Agreement (or Contract) for Construction between the Owner & the CM/GC for Stipulated Sum (or Lump Sum)

A201: General Conditions of the Contract

A312: Construction Bonds including both the Performance Bond & Payment Bond

A701: Instructions for Bidders

96: State of Indiana Bid Form

500

This Spec type lists 2 or more acceptable Products with the opportunity for Bidders to submit other similar Products for review & approval.

What is an "Open" Proprietary Spec section?

500

This Part (in SectionFormat) is code for "Installation processes"

What is Part 3-Execution?

500

These items are submitted after the construction is completed (or after the DOSC: Date of Substantial Completion)

What are Post-Construction Submittals (or Contract Close Out Submittals)?