Selection and Payment
"P"roject Terms
PDM By Example
Name that Phase
More PDM
100

When selecting a contractor using this method, cost is king 

What is hard-bid, low-bid or price based selection?

100

The lowest one of these will win you a job in the Design-Bid-Build method

What is a price?

100

Toll roads are often financed, built and operated by a contractor in exchange for user fees with this delivery method

What are Public Private Partnerships (P3)?

100

The electrical contractor determines the best way to route wiring between electrical components.

What is construction?

100

This linear delivery method makes it very difficult to fast track a project

What is Design Bid Build?

200

In this open book contracting arrangement, a contractor provides a price that they will not exceed.

What is a Guaranteed Maximum Price (GMP)? 

200

This word is interchangable with the contractor/designer who holds the subcontracts on a project

What is the prime?

200

To build the International Student Pavilion, NAU benefited from having a contractor involved in the design phase using this method

What is Construction Manager at Risk (CMAR)? 

200

A new tree dies just after substantial completion, the landscaping contractor replaces it on warranty

What is post-construction?

200

This collaborative delivery method is facilitated by BIM and Lean Construction techniques

What is Integrated Project Delivery?

300

An owner releases an RFQ and a contractor responds with an SOQ in this procurement method

What is Qualifications Based Selection?

300

This is the action/phase in a project where things are bought

What is procurement?

300

For their facility expansion, NAIPTA chose this method, where the architect and prime were hired under a single contract

What is design build? 

300

Nurses create a list of needs for a new nursing station within an existing hospital

What is pre-design?

300

An owner may hire one of these to act as a consultant for any of the project delivery methods

What is construction manager as agent (CMAA) or owner's rep?

400

This selection method considers both cost and qualifications

What is best-value?

400

Created by the owner during the pre-design phase, it defines the activities, functions and spaces required in a building

What is the program?

400

Complex projects requires complex solutions.  That is why Banner Health chooses to use this collaborative delivery method

What is Integrated Project Delivery?

400

The site superintendent for a project is selected and she reviews drawings prior to mobilization

What is pre-construction?

400

After the design phase, a CMAR will submit one of these to the owner for approval.  If accepted, the CMAR will then act as GC for construction

What is guaranteed maximum price (GMP)?

500

In this compensation method, a contractor is reimbursed for their expenses accrued in addition to an agreed upon profit percentage

What is cost-plus?

500

This type of insurance will pay an owner if a contractor (or subcontractor) fails to complete their scope on a project

What is a performance bond? 

500

Oh no! There is a water main break at Flagstaff High, better hire an on-call contractor using this delivery method

What is Job-Order Contracting (JOC)? 

500

The electrical engineer selects a lighting fixture package

What is design?

500

This method works well when an owner doesn't have enough upfront capital to finance their project

What is public private partnership (PPP)?