Risk is Too High
Safety First
Estimate This!
Tight Schedule
Cruise Control
Project Admin
100

Is a procedure of identifying and analyzing the risks in your business in order to reduce their effect.

What is Risk Management?

100

The freedom from danger, risk, or injury is called.

What is safety?

100

Is the process of forecasting the cost of building a physical structure.

What is Construction Estimating?

100

In project management, this tool is most commonly used to plan the project step by step.

What is a schedule?

100

This is  a set of tools, processes and people skills that are used together to help project managers have the right information, at the right time, to make the right decision.

What is project controls?

100

Legal basis of a contract for constructing a project, managing transactions and relationships involved in construction projects.

What is AIA Document A201?

200

Is a deformity in the design, workmanship, or materials used on a project that causes damage to a structure, person, or property.

What is a construction defect?

200

Construction injuries fall under these two categories.

What is Fatal Construction Injuries and Non-Fatal Construction Injuries?

200

In estimating, this is the most difficult item to determine because both the hourly wage rate and the crew productivity must be considered.

What is labor cost?

200

This is the most popular and useful method of showing activities (tasks or events) displayed against time.

What is a Gantt Chart?

200

Control is focused on three elements of a project, which are.

What is quality (or performance), cost and time?

200

Letter from the owner to a contractor, which documents the official project start date, as outlined in a contract. Usually used when a contractor needs to be awarded promptly while final contract is being reviewed.

What is Notice to Proceed?

300

Important document that all construction managers should review regularly and be familiar with.

What is the project's contract?

300

With the Occupational Safety and Health Act of 1970, Congress created this entity to ensure safe and healthful working conditions for workers.

What is Occupational Safety and Health Administration (OSHA)?

300

Is a type of estimate typically used on larger commercial projects where a particular assembly or system repeatedly appears in project. 

What is Assemblies or Systems estimate?

300

In project management, this defines the amount of time a task can be delayed without causing a delay.

What is a float?

300

Type of project control analysis that serves as a checklist that determines whether the project should enter the next step or not.

What is a Go/No-Go Analysis?

300

These are submitted as supplement document to verify that a standard product will meet the specifications. 

What is product data?

400

The biggest reason efficient change order management is crucial is to.

What is ensure all work is billed?

400

The four leading causes of construction deaths (falls, struck by equipment, caught in between objects and electrocutions) are also called.

What is the “Fatal Four”? (Falls, Caught-In or -Between, Struck-By, and Electrocution)

400

The Construction Specification Institute (CSI) has created the “de facto” standard for the construction industry, known as the.

What is the MasterFormat?

400

Name of the process of running multiple activities on the critical path in parallel in order to reduce overall project time.

What is fast tracking?

400

When an activity requires repeated installation or removal of a piece of work, you can use this approach to project control.

What is a units completed approach?

400

Project payments are prepared either on contractor’s own form or this document.

What is AIA Document G702?

500

If your job site is near a fault line, in an sinkhole-prone area or in a hurricane area, what type of risk is this?

What is the environmental risk?

500

One of the major inequities of OSHA is that only this group of individuals may be penalized for safety violations.

What is the employer?

500

Owners use this type of estimates to determine if a project merits closer evaluation or to screen for the best project among several alternatives.

What is Rough Order of Magnitude (ROM)?

500

These are the two types of network schedules.

What is Critical Path Method (CPM) and Performance Evaluation & Review Technique (PERT)?

500

Controls are instituted at this stage of the project.

Earliest stage (conceptual) of the project.

500

Document signed in exchange for payment that waives the signer’s right to file a lien for the amount specified in the waiver.

What is a lien waiver?