Organization
EAC/ETC
Calculations
Scheduling & Planning
VAR Corrective Actions
100

Identifies the responsibility, accountability for each segment of work

What is the OBS?

100

The two components that make up an EAC

What are ACWP + ETC?

100

The Cost Performance Index (CPI) is a measure of:

What is cost efficiency?

100

The preferred relationship type used in the IMS

What is Finish to Start?

100

The tool used to record corrective actions

What is Empower?

200

All approved Schedules, budgets, work authorization, and cost collection is considered

What is the Performance Measurement Baseline (PMB)?

200

Monthly EAC analysis should consider _____ along with the remaining quantities, resources, and risk

What is CPI?

200

The earned value method where BCWP equals BCWS

What is LOE?

200

The currently approved time phased plan for executing work

What is the Baseline?

200

Target duration for corrective actions to be addressed

What is 30 days?

300

A direct representation of all authorized work scope on the project

What is the WBS?

300

Realization hours on LOE staffing plans are used to ______

What is to calculate the manhours per period?

300

What is the SPI most probably going to be at the end of a project

What is 1.0?

300

The IMS must be developed with integration through these two structures.

What is the WBS and OBS?

300

Corrective actions are recorded where

Where is the VAR and the VAR corrective action log?

400

The organization or function responsible for controlling indirect Cost

Who is F&A (CFO or Accounting)?

400

Supplemental detail required with TLSM classification of % complete, Weighted Milestone, or Units Complete

What is a Quantifiable backup data (QBD)?

400

A WP using 0/100 TLSM is reported at 95% complete – What is its earned value  

What is zero?

400

What this represents in the schedule:

What is behind baseline and on critical path?

400

The two fields to be updated when actions take multiple periods to complete

What are % complete and Due Date?

500

The integration of the ___ and ___ creates the control account and facilitates the schedule and cost performance measure

What is the WBS and OBS?

500

Monthly EACs should be timely, accurate, reliable and ________

What is auditable?

500

If CPI is 0.85 and TCPI is 1.25 for a control acct – then future performance must be ________ than in the past

What is more efficient/better?

500

** Daily Double **

The definition of total float

500

The term used by the CAM at the point the corrective action has been completed

What is Submitted?