TEAM
BUILD
WHAT IS IT?
PLAN
CONCRETE
100

The transfer of intended meaning.

What is communication?

100

Separator between the interior and exterior environment.

What is building envelope?

100

This mortar type of medium strength is common in construction.

What is type N?

100

A cut-through view of the building or object.

What is section plan?

100

ACI 302.1R-96

What is guide for Concrete Floor and Slab Construction?

200

Have a clear understanding of common targets.

What is teamwork?

200

Can replace 1/2 of the required amount of Portland cement in concrete mix.

What is fly ash?

200

FE

What is fire extinguisher?

200

Should be referenced in addition to plans and specifications.

What is submittals?

200

40% to 60% of concrete wall cost.

What is formwork?

300

The Three C's - Capital, Character and Capacity.

What are subcontractor qualifications?

300

Soil type that is plastic, sticky and feels smooth and greasy.

What is cohesive soils or clays?

300

It runs downhill.

What is sanitary sewer and storm drainage?

300

The amount of time a task can be delayed in a schedule.

What is float or slack?

300

One cubic yard of concrete.

What is 27 CF or about 4,400 pounds?

400

Gives structure to the construction process.

What are schedule and goals?

400

Sets the design standards for fire protection.

What is NFPA?

400

Gas pressure range.


What is 20 psi to 50 psi?

400

Working from a target completion date (milestone) backwards.

What is pull planning?

400

The most common type of curing concrete.


What is dissipating curing compound?

500

Members can express their feelings and ideas.

What is an effective team?

500

Amount of tons required to cool 1,050 SF of office space.

What is 3 tons?

500

Material's thermal resistance to conduction heat transfer.

What is R-Value?

500

Site is stabilized.

What is reason to get Notice of Termination of SWPPP?

500

85% of Concrete Compressive Strength.

What is first 7 days?