TIME AND COST
INFORMATION SYSTEMS
Computerized Project Admin
Changes and Claims
Changes and Claims 2
100
Activities completed before the next activity
What is Finish to Start?
100
BIM means .
What is Building Information Systems?
100
This is the primary form of written communication is done.
What is a word processor?
100
C.O. P means.
What is Change order proposal?
100
These persons must be aware of each change order process
The owner, architect, and contractor
200
When two activities should be completed at the same time.
What is Finish to Finish?
200
This view provides a more accurate view of the proposed project used in BIM
What is 3D?
200
Allows the user to store, group, and quickly retrieve data.
What is a database?
200
A settlement or adjustment to contract amount is known as
What is a change order?
200
Work is not authorized to proceed until the change order is signed by
The owner and contractor
300
This is the manifestation of the project plan. A written or graphical depiction.
What is the project schedule?
300
identification of locations that building elements could imcompatibly intersect.
What is clash detection?
300
A definition used to describe control of submittals.
What is Document Control?
300
Change that occurs when the amount of work change form that in the contract.
What is change in scope?
300
This change can occur from a simple defective specification to direct change in the contractor's method
What is Constructive change?
400
Errors on a report would be one example.
What is discrete data?
400
This system provide 2D uniform construction documents.
What is CAD?
400
The second largest type of generic application used by project management professional for daily operations.
What is a spreadsheet?
400
An unresolved change request
What is a claim?
400
C.C.D means .
What is Construction Change Directive?
500
A calculated path for the project that considers the dependencies of the predecessors.
What is the critical path?
500
R.F.I.D means
What is Radio Frequencey Identification Tags.
500
These are the two leading softwares in the construction industry
What is the Trimble Prolog and Oracle's Primovera Contract Management?
500
An amount stipulated in the contract documents that states that the owner receives compensation for impacted costs of late completion of a project.
What is Liquidated damages?
500
The way in which the contractor constructs and designed the product is known as .
What is Means and Methods?