Software and Programs
Asphalt 101
Operations/ Equipment
SAP
Project Management
100

What distinguishes an EZ form from an full AFE?

50,000

100

What element is required to react polymer and asphalt?

Sulfur 

100

This item sends signal waves into the tanks to determine product level.

Radar Gauge

100

When writing a requisition/ work order in SAP, which category will you enter the dollar amount?

Quantity 

100

What is the company code for Ergon Asphalt and Emulsion & Ergon Asphalt Partners  

165/175

200

The first step after receiving a project is to create what & where?

Create a project folder - J drive

200

 What are the three main ingredients required to make Emulsion?

Asphalt, Water, and Soap 

200

What piece of equipment heats water into steam?

Boiler and or Steam Generator 

200

When writing a requisation/ Work Order who is the recipient?  

Plant Maanger 

200

What is the initial phase of a project called ?  

Scope and Development (Stage B)

300

When Searching for existing specs to send to contractors, use this?

Policy Tech

300

A fluid's internal resistance to deformation i.e. Thickness. This parameter is used in many state specification tests.

Viscosity 

300

What are the four ways we heat product

Electric, Steam, Oil Based Thermal Fluid (Hot Oil), Water Based Thermal Fluid (Hot Water, Glycol) 

300

The header text is used to relay information to which Ergon group?

The Procurement Group 

300

What does P&ID stand for 

Piping and Instrumentation Diagram 

400

Where to you go to view master project list and project progress?

Smaersheets 

400

What type of pump would we use in an asphalt application?

pd pump -> gear pump

400

What metal(s) can be used in polyphosphoric acid and Caustic applications?

What Material/Metal(s) can be used in hydrochloric acid service? 

Stainless Steel 

CPVC is recommended, but if metal must be used, it must either be Hastelloy or PTFE lined 

400

This allows us to attach work orders to a piece of equipment and allows us to track all work done to that equipment. 

Functional Location 

400

What type of schedule layout is used to display project timeline?

Gantt Chart 

500

What is the 3 digit number that designates engineering drawings on the R drive

099

500

What does the "64-22" denotion stand for in asphalt product names?

The Binder can withstand up to a 7 day mean temp of 64C (147F) before rutting and a 1 day low temp of -22C (-8F) before cracking

500

What are the two main pump types used in the production of asphalt products & the main difference?  

Dynamic/ Kinetic & positive displacement

Dynamic - Uses an impellor to generate high flow at low pressures (Thin Fluids) 

PD - Traps a fixed volume and mechanically moves it, generating constant flow at high pressures (Viscous Materials) 

500

What is the three didget code behind a project? What is it used for? What is the code for "Major Equipment" 

WBS Element, Tracking Project Cost by Category, 200

500

What two columns must show $0 before closing out a project? 

Commitments and Residual