5 Key Moments
Craft
Craft Continued
Routines
DPM Warming
100

This is Key Moment number 1.

What is Warmly Greet Customers?

100

The number of shots for each size of a decaf Coffee Frappuccino blended beverage.

What is T-1/G-2/V-3 shots of decaf?

100

The fill indicator if a beverage build calls out a “ridge” for a fill line (i.e. for strawberry puree in the Strawberry Creme Frappuccino).

What is the top dot near the bottom of the cold cup?

100

This is the 1st Major step in every beverage routine.

What is label the cup (sticker over boxes) and write note on cup?

100

This is how items are displayed in the Warming Station View.

What is individually with clear status indicators?

200

This is Key Moment number 2.

What is Offer For-Here Ware?

200

The label placement location for to-go food items and for-here food items.

What is to the right of the Siren's Eye on respective bag and what is under the plate folded so that customer name is prominently showing?

200

The 8 step recipe for a tall Mocha Cookie Crumble.

What is...

1. 2 Pumps Frapp Roast

2. Pour Whole Milk to lower line on cup

3. Pour Cup Contents into blender pitcher

4. 2 Pumps Mocha Sauce (half dose pump) 

2 Scoops Frapp Chips

Add ice with Tall scoop

5. 2 Pumps of Coffee Frapp Syrup Base

6. Blend on #1

Add 1" of whipped cream to bottom of cup

7. Add 7 shakes of chocolate cookie crumble topping

8. Finish

Pour blender contents into cup, top with whipped cream, mocha drizzle in a standard spiral, 4 shakes of chocolate cookie crumble topping and lid with dome.

?

200

These are the Major Steps of the Milk Steaming Routine.

What are:

1. Pour milk

2. Aerate milk

3. Auto Steam milk

4. Sanitize Wand

5. Groom milk

?

200

This is what marking items as "Ready" in the Warming Station View helps ensure.

What is timely hand-offs and alignment with food routines?

300

This is Key Moment number 3.

What is Craft Beverage with Message on Cup?
300

These are the 3 numbers to remind us of the proper way to craft the caramel drizzle on top of the beverage.

What are 7/7/2?

300

This is how long you aerate milk for a latte compared to a cappuccino.

What are 1-3 seconds for a latte and 6-8 seconds for a cappuccino?

300

These are the 4 major steps of the Customer Support Cycle and its cadance.

What are...

1. Brew Coffee - Clover Vertica Skips this Step and only resets timer to current cadence 

(Peak: 15 mins, Off-Peak: 30 mins.)

2. Check Lobby (has its own routine)

3. Complete a Cycle Task (Check/replenish ice/dairy based on signals or select one task from cycle task list to complete each cadence.)

4. Assigned by the Play Caller (Complete the Ready-Set-Go Checklist or Complete the Station Card Task     or Complete Station Restock.)

300

This is the main benefit of the Warming Station View in DPM.

What is to give a clear queue overview, reducing time spent managing orders manually?

400

This is Key Moment number 4.

What is Direct Hand-Off?

400

The specific way you measure ice when crafting an Iced Shaken Espresso.

What is filling the ice to the ice line on the shaker?

400

You should hear this when milk is being steamed correctly.

What is a paper-tearing sound?

400

These are the 4 Major Steps of the Check Lobby Routine which is inside of the Customer Support Cycle Routine. 

What are... 

1. Check & stock condiment bar

2. Bus For-Here Ware

3. Check & stock restrooms

4. Finish

(Peak Go Mode Set timer to 15 minutes and return to your deployed position. Off-Peak Continue Customer Support Cycle.)

During all steps of the routine we are working while smiling and warmly greeting customers.

400

This is why the Warming Station View is especially helpful for the Green Apron Host.

What is it supports consistent order readiness, allowing them to stay present with customers?

500

This is Key Moment number 5.

What is Clean Lobby and Condiment Bar?

500

This is where you place labels on for here ware cups.

What are next to the handle (between handle and siren) at the bottom of the cup as far away from the rim as possible and on a flat side at the bottom of the cup as far away from the rim as possible?

500

The way you position the steam wand when milk is being steamed correctly.

What is the steam wand should be positioned to the back of the pitcher during auto steam?

500

These are the 4 Major Steps of the Peak Play Caller Cycle Routine.

What are...

1. Observe

2. Assess Bottlenecks

3. Resolve Bottlenecks

(Communicate with barista and flex into play where bottleneck is occurring and then communicate with barista to flex out once bottleneck is resolved.)

4. Finish

(Celebrate resolving bottlenecks and baristas working in routine! Provide coaching, if needed, and direction to reset play. Create feedback loop by capturi bottleneck trends for next level leader.)

500

This is a best practice when using the Warming Station View.

What is warm items together only when they are next to each other?