Documentation
Safety
Equipment
Quality
Speed Winding
100

A step by step guide using images and instructions to perform a task safely, correctly, and consistently

What is Visual Operating Procedures

100

This is used to maintain traceability of any safety observations

What is the Observation Tracker?

100

This winding machine uses wire, not strip, while the other uses strip and not wire.

What is the PT and Reactor winder machine?

100

This statement is a summarization of our Quality policy

What is I Own Quality?

100

This routine is conducted following each shift to ensure a safe, clean, and functioning work environment

What is 5S+?

200

A guide that displays how much material to use, where to put it, and how to wrap it to produce a coil.

What is a winding sheet?

200

These are the four main PPE requirements for Coil Winding

What are safety toes, safety glasses, ear protection, and sleeves?

200

This form is completed daily prior to operating any hoists or cranes

What is Crane and Hoist Checklist?

200

A label that is required on all tools and calibrated materials prior to its usage on the production floor

What is a Calibration sticker?

200

This product/device keeps electrical voltage steady at a safe level.

What is a voltage regulator?

300

An EHS approved document used to capture processes that fall outside of normal procedures and must be signed by individuals prior to completing task

What is Nonstandard Work?

300

This 3-word phrase reflects Eaton's safety mindset and principles.

What is I choose Zero?

300

This machine cuts the ETR strips

What is the 4-Bar slitter?

300

List the Quality Rules of Engagement

What is 1) Training and Qualification, 2) Standard Work & Compliance, 3) Error Proofing Devices, 4) Data Integrity, 5) Process Deviation, 6) Material Control?

300

These three phrases reflect the new Eaton Culture Model

What is Think Big, Act Boldly, and Win Together?

400

This set of principles is violated when documents are falsified.

What is the Code of Ethics?

400

List all of the Life Saving Rules

What is 1) Fall Protection, 2) LOTO, 3) Confined Space, 4) Seat Belts and Restraints, 5) Arc Flash, and 6) Machine Guards and Devices?

400

This machine helps achieve the appropriate E-dimension required for the coil

What is the Coil Press machine?

400

When parts fail quality checks, they are sent to this location for review and disposition.

What is the MRB area?

400

This product/device changes electricity to the correct level for everyday use.

What is a single-phase transformer?

500

A required document that confirms a process works as intended and consistently makes good parts.

What is a Process Qualification Plan?

500

For a storm, fire, or active shooter situation, employees should go to these locations and/or follow these actions.

What are restrooms, outside assembly points, and run, hide, and fight? 

500

List the amount of Main Winding, PT Winding, and Reactor Winding machines we will be receiving

What is 2 Main Winders, 1 PT Winder, and 1 Reactor Winding machine?

500

This type of event is performed to verify compliance with company procedures and standards.

What is an audit?

500

This government organization sets and enforces workplace safety rules to protect employees across various industries and agencies.

What is OSHA (Occupational Safety and Health Administration)?