Bonds/Ins.
IES Personnel
Executive Branch
Bid Reviews
Process & Procedure
100

It's a calculated add at .0022 of the total.

What is textura?

100

The PreCon Manager for MCG1. Should be optional on all OPS reviews and required on all SLT reviews.

Who is Scott Meyer?

100

IES has an Executive level. Each group is designated with an acronym.

What is MCG1, MCG2, and LBG?

100

The bid review meetings should be scheduled for more than 24 hours before this review (minimum).

What is the OPS Review?

100

He is responsible for opening WEBID, run Wizard, contact sales for Distribution, Manufacturing, and General Information, and update Estimate Process Steps within 24 hours of job being assigned.

Who is the Estimator?

200

This is a deduct for a customer provided insurance program.

What is OCIP/CCIP?

200

The PreCon Manager for MCG2. Should be optional on all OPS reviews and required on all SLT reviews.

Who is Ian Gregory?

200

The Executive Director for MCG1.

Who is Kohltin Simmes?

200

The bid review meetings should be scheduled for more than 48 hours before this review (minimum).

What is the SLT Review?

200

All these questions must be answered by the estimator prior to the bid review meeting. These questions are required for all estimates, regardless of sell amount.

What are the estimator questions?

300

The standard hourly rate, benefits, and overtime paid to the majority of workers in a specific trade or occupation within a given geographic area.

What is Prevailing Wage?

300

The Vice President of IES Pre-Construction.

Who is David Camper?

300

The Executive Director for MCG2.

Who is Matt Femenia?

300

The bid review meetings should be scheduled for more than 72 hours before this review (minimum).

What is the CEO review?

300

These questions must be answered during the bid review meeting for all jobs over $100K. The most senior reviewer, as indicated by sell amount, is expected to complete these questions.

What are the reviewer questions?

400

The purpose ensures that the contractor pays their subs, suppliers, and laborers and guarantees the contractor will complete the project as per the contract terms.

What is a P&P Bond?

400

The Vice President of IES Operations.

Who is Brad Sandman?

400

The Executive Director for LBG.

Who is Matt Moore?

400

He is responsible for scheduling a supplemental support team meeting for the applicable Estimators and Lead Estimators at the same time as the CEO bid review meeting to ensure team is available for questions regarding the estimate.

Who is the Pre-Construction Manager?
400

The Project Bid Summary Sheet, Travel Calculator, and Labor Units can be found here.

What is the Pre-Con Estimating Tools App?

500

The purpose is to ensure the bidder will honor their bid and sign the contract if awarded the project.

What is a Bid Bond?

500

The Director of Virtual Design and Construction. Always reach out to him with BIM and CAD questions.

Who is Jason Young?

500

Each Executive Director has a Delegation of Authority "DOA" level of this range.

What is $4,000,000 to $7,500,000.

500

He is the Strategic Executive Analyst who is responsible for scheduling all CEO level bid review meetings for the CEO and the applicable SLT members. Additional Ops Management (Department/Branch/Division managers) may be included as needed.

Who is Hunter Ray?

500

All bid reviews must have this corresponding platform as a single point of interface for all Estimators, Estimating Leads, Pre-Con Managers, or Sales Support personnel who are involved in the bid process.

What is a Team's Chat?