Safety First or Face the Worst!
Pillars of Strength!
Beam Me Up, Carpenter!
Slab it Together!
Support or Collapse!
100

This safety feature must be installed around slabs and openings when a fall of more than 3000 mm is possible.

What is a guardrail?

100

This vertical structural element supports loads from above.

What is a column?

100

These structural elements transfer loads from slabs to columns.

What are beams?

100

This type of slab is commonly used in parking garages.

What is a slab with drop panel?

100

This support system is commonly used in confined spaces.

What are jacks?

200

Before concrete pouring begins, this document must be signed and sealed by an engineer.

What is a compliance certificate?

200

These triangular wooden pieces soften the edges of a concrete column.

What is a chamfer?

200

These two types of beams are classified based on their position relative to the slab.

What are conventional and inverted beams?

200

Joists for slab formwork are typically spaced this far apart.

What is 405 mm (16 inches)?

200

These heavy-duty scaffolding frames provide strong support for concrete formwork.

What are HD frames?

300

This section of the Construction Safety Code (CSTC) is dedicated to the shoring of concrete formwork.

What is Section VI?

300

The two most common shapes of concrete columns in construction.

What are square and cylindrical?

300

This type of beam supports other beams.

What is a master beam?

300

This type of slab is used in residential buildings.

What is a flat slab?

300

These components in a metal frame support system ensure lateral stability.

What are cross braces?

400

If part of a guardrail is removed, workers must use this for safety.

What is a safety harness?

400

This modern tool allows for column placement without using strings or plumb lines.

What is a theodolite or total station?

400

Before placing beam formwork, this must be done to ensure the structure is correctly aligned.

What is leveling the columns?

400

This process supports the structure while the concrete cures and gains strength.

What is re-shoring?

400

This type of scaffold is pre-assembled and moved with a crane, making it efficient for high-rise construction.

What is modular scaffold (flying formwork)?

500

A ladder must extend at least this much above the upper landing.

What is 900 mm?

500

Before installing formwork ties, this must be done to ensure a column is properly aligned.

What is squaring using a plumb line or working from above?

500

Name two safety measures required before working on beam formwork.

What are guardrails and safety harnesses?

500

Before removing slab formwork, this must be verified.

What is concrete maturity and engineer approval?

500

The three main components of a metal frame support system.

What are vertical frames, cross braces, and horizontal beams?