Over 7 million
What is the number of workers in construction?
The visible phase of a project.
What is the executing phase?
This is the ultimate focus in the planning process.
What are the deliverables to be produced?
This is prepared using a full (100%) design package.
What is the Bid or Final estimate?
Walking the project with the key customer to evaluate their satisfaction with the results.
What is the punch-list walk?
Here you find the project name and address, issue and revision dates, and contributing firms.
What is the title block?
This type of construction makes up about 1/3 of the total construction market.
What is commercial building?
The most critical phase to success of a project.
What is the planning phase?
The smallest measurable piece of work.
What is a work package?
This can waste materials, delay construction, and/or increase construction costs.
What is/are the wrong quantities?
This list of items is a great reference for future projects.
What are lessons learned?
This gives a 3D view of the structure.
What is an isometric view?
Cultural, social, political, and physical.
What are project environment factors?
The customer develops a lasting impression by this phase.
What is the closing phase?
They care about or have a vested interest in the project.
What is a stakeholder?
The cost agreed upon is the same regardless of effort applied or delivery date.
What is a fixed-price contract?
This includes charter documents, original budget, change document, and lessons learned.
What are the documents to be archived for the project?
These are indicated with an A in the sheet number and include floor layouts, roof plans, and associated elevations or cross-sections.
What are the architectural drawings?
$97,990
What is the median wage for a construction manager in Colorado?
Where the business case is developed.
What is the Initiating phase?
The possibility that an outcome will be different than what was planned for.
What is risk?
This profit remains the same no matter the effort or deadline of the project.
What is a cost-reimbursable contract?
This includes final drawings, O&M manuals, warranties and training.
What are the items in project hand-off to the owner?
This table calls out line types and symbols that are found on the drawing and what they mean.
What is the legend?
This highly specialized form of construction usually has deep involvement by the owner.
What is industrial construction?
In this phase, we're verifying deliverables conform to the scope.
What is the Monitoring and Controlling phase?
This represents the set or sequence of activities that will take the longest time to complete, and has the least room for delays.
What is the Critical Path of a project?
The acquisition of products or services not produced or delivered by your project team.
What is Procurement (or procurement management)?
This is issued after all sub-contractors have been paid, documents are submitted, and client has verified completion of project.
What is the final payment?
This table gives you specifications on the size, material, and finish of a set of items on the drawing.
What is a schedule?