Safety
Field Quality
Field Construction Management
Field Materials
Field Commissioning
100
This professional reports to the Project Field Manager onsite, and is responsible for implementing, administering and maintaining the Safety & Health program onsite. This professional has 5 years of experience in a construction environment and 5 years of safety and health experience.
What is Safety Manager
100
This professional is responsible for the administration of the quality program at the site and reports to the Project Field Manager. He or she typically has 5 years of experience as a superintendent with a degree or 8 years of experience without, additionally, holds certifications such as a AWS (American Welding Society) or CWI (Certified Welding Inspector.)
What is Site Quality Manager
100
CPPM
What is Construction Processes and Procedures Manual, this is the main and base procedures manual for field operations.
100
This professional is responsible for the overall materials management plan. The professional reports to the Project Field Manager, and typically has 7 years of relevant experience.
What is… Field Materials Manager
100
This professional has responsibility over all the activities to be performed in relation to the systems transferred from the construction team to the commissioning team. They report to the project field manager and typically have 7 plus years of startup experience with experience as a startup manager.
What is Commissioning Manager
200
Document of Black & Veatch’s governing corporate policies.
What is… Black & Veatch Safety Procedures, which can be found on the Inet and everyone in the company has access.
200
Monitoring implementation and effectiveness of the project-specific Field Quality Control Program and have the authority to revise it. Verifying inspections and tests are performed and properly documented to ensure that work, materials, and equipment are in compliance with plans and specifications. Interfacing with local governing bodies to verify that requirements are met.
What is… Duties that are performed or delegated by Site Quality Manager
200
This professional is the lead Black & Veatch professional at the site and is responsible for all onsite activity including startup. The professional reports to the Project Manager and Construction Operations Management and typically has 20 plus years experience, 5 of those being in a construction management role.
What is… Project Field Manager
200
SiteSense and C2C
What is… Material/inventory management systems for receiving and tracking/staging all permanent plant materials, direct material, rental equipment, small tools, and safety materials for the project.
200
The overall checkout and optimization of facility systems and controls.
What is Hot Commissioning
300
Addresses harness/ Safety line use, handrail and opening protection rules and proper scaffold erection use.
What is… Fall Protection
300
Job-site trailers, Break/ lunch rooms, Job-site bulletin board, Employee gate/ entrance
What is Job-site signage locations.
300
Number of B&V Construction Philosophies
What is… 10
300
This professional is assigned to a project with the responsibility for overseeing the uploading of information into the material/inventory management system. This professional is typically based in the project home office and may support several projects.
What is Materials Coordinator
300
CEP
What is Commissioning Execution Plan
400
RIR – LTIR – DART
What is… Recordable Incident Rate, Lost Time Incident Rate and Days Away, Restricted or Transferred.
400
A program that was created to engage all C&P project staff into gaining an understanding of the Quality requirements for a project.
What is… Behavior Based Quality.
400
Lessons Learned
What is… A process that is intended to document construction improvement recommendations, identifying improvements that can be made in the future, both on a project-specific and generic basis.
400
These professionals directly report to the Materials Manager
What is… Open Box Inspectors, Unloading Crew, Materials Coordinator and Warehouse Personnel.
400
The action of safely isolating energy sources after a system has been turned over to the commissioning team.
What is Lockout/ Tagout