SHOCKING
STAY OUTTA MY BUSINESS
WHICH ONE IS IT
OH GIVE ME A HOME
123 CONTACT
100

The conduit above the meter used to provide mechanical protection for the service conductors and to support the service drop.

What is a Service Mast?

100

A listing often seen in Commercial spaces for equipment identifying the Kilowatts and Amps needed to operate.

What is the Load Information

100
Relocation of insulator, with or without change in meter base equipment or location, even if transfer to new insulator was done already by the customer's electrician.

What is a 593 Overhead Modified billed at $339.00 + $10 each additional foot.

100

Residential Electric service needing 320 Amps of service 375' from the transformer

What is a Complex Electric service order requiring assistance by a Project Manager

200
The amount of current drawn from an electric service necessary to start and Electric Motor.

What is Locked Rotor Current?

200
A document used when all or a portion of Electric service is intended for use in Retail or general public activities including public wells, barns and garage shops/outbuildings.

What is a Non-Residential Electric Service Application

200

Customer is using wire greater than 350MCM, Copper, or installing multiple runs.

What is a Commercial Modified Scenario that requires PM review?

200
A series of numbers used to identify the relationship of the customer to Puget Sound Energy

What is a Business Partner number?

300

Relocating or Rerouting the Residential underground service line either by lengthening, shortening or moving for construction.

What is a 594 Underground Modified billed at $497 + $10 ea additional foot?

300
A group of servicemen trained to complete Commercial Single Run Connect and Sets

Who are Meter Operations Technicians?

300

Data that identifies the location of an electric or gas service meter.

What is the functional location?

400

A sealable cabinet designed for surface or flush mounting, and provided with a frame or trim in which doors or removable covers are hung.

What is a Current Transformer (CT) Enclosure

400

5 or more lots or more than 2 multi family buildings

What is a A plat service request?

500
A sound, round reasonably straight, made of wood and a minimum of 30 feet long and 5 1/2" in diameter

What is a Customer Owned Meter Pole?



p.35- EHANDBOOK

500

Restaurant owner is installing new equipment and needs more gas for his larger equipment.

What is a Commercial Gas Meter Upgrade?

500

Commercial Customer converting OH to UG but keeping the same meter.

What is a Commercial modified #587 service order to connect the new underground service and a #108 to retire the OH service wire?

500
An inquiry or Field visit necessary when the customer and our maps indicate that the pole is on a private road or neighboring property.

What is a Right of Way review?