Sustainability
Math
Earn Value Metrics
Risk Management
safety
100

Sustainability includes elements of ____, ____, and ____.

Sustainability includes elements of planning, design, and construction.

100

(SV) Schedule variance is____ -_____.

BCWP-BCWS

100

What is BCWS?

Budgeted cost of work scheduled (to be performed during a specific period of time)

100
What are the four ways to mitigate and control a risk?

1. avoid

2. reduce

3. transfer

4. retain


100

what are the fatal four safety hazards?

falls, struck by an object, electrocutions, and caught in or in between an object

200
What is triple bottom-line framework for sustainability?

SEE: society, environment, and economy

200

Cost variance is _____-_____.

BCWP-ACWP

200

What is BCWP?

Budgeted cost of work performed- work that is actually performed during a specific period of time 

also means: Earned Value 

200

what are the 2 ways to identify a risk?

1. fault tree analysis

2. fish bone

200

Who can be affected by lack of construction safety?

working on site, visiting site, and general public near site

300

Even if it is designed "green" and built "green" and achieves some level of certification, if it is not maintained and operated "green" it is not sustainable. True or false?

True. it needs to be maintained green to be considered sustainable.

300

SPI=____/____

BCWP/BCWS

schedule performance index


300

What is ACWP?

Actual cost of work performed - actual cost of the work that is performed during a specific period of time 


- monitor time and cost

- equal to AC

 

300
How do you assess a risk?
risk matrix 
400

CPI=____/____.

BCWP/ACWP

400

when is a project ahead of schedule or behind schedule?

When (SPI) schedule performance index is:

ahead of schedule: SPI>1

behind schedule: SPI< 1

when (SV) schedule variance is:

SV>0; ahead of schedule

SV<0; behind schedule


500

When is a project under budget or over budget?

when (CV) cost variance is: 

CV> 0; project under budget

CV<0; project under budget

When (CPI) cost performance index is:

CPI>1; under budget

CPI<;over budget