100

An apprentice is asked to find and distribute the sag rods needed for each elevation. The north side needs 42, the south: 29, east: 64, and the west side: 58. How many sag rods does the apprentice have to find?

What is 193 sag rods?

100

There are 587 tons of stone on the job. A large stone crew installs 119 tons the first month. Another smaller crew installs 35 more in the same month. How many tons of stone are remaining on the jobsite?

What is 433 tons left?

100

A team of 4 Marble Masons can install 24 large panels in a working day. How many panels can they install in 14 working days?

What is 336 panels?

100


There are 320,000 brick to be installed on a job, estimating that each of 10 bricklayer will lay 800 brick per day, how man-days will it take to complete the building?


What is 40 days?

100

Five and eight-tenths as a written number.

5.8

200


A rectangular piece of Bluestone measures 17" on the two long sides and 13" on the two short sides. To determine the perimeter (or length around the outside), you add the lengths of the four sides. What is the perimeter of the plate?

What is 60"?

200

A truck load of granite weighs a total of 18,986 lbs. The load consists of three bundles. The first one weighs 3,768 lbs, and the second weighs 7,421 lbs. What is the weight of the third bundle?

What is 7,797 lbs?

200

A typical tub surround requires 200 6" × 6" tiles. How many tiles will be required to fully install 5 tub surrounds?

What is 1,000 tiles?

200

An apprentice worked 9 days straight at the same location. According to the truck’s odometer, the apprentice drove 774 miles. If the only driving was to and from work, how far was it to work (one way)

What is 43 miles?

200

The combined thickness of a piece of sheet metal 0.078-inch thick and a piece of band iron 0.25-inch thick is what total?

0.328 inches

300

On Monday, an apprentice installed 230 – 3" × 3" tile and 120 – 4" × 4" tile. Tuesday, the apprentice installed 370 – 3" × 3" tile, Wednesday: 364 – 4" × 4" tile, Thursday: 430 – 3" × 3" tile, and on Friday: 411 - 4" × 4" tile. What is the total number of tile the apprentice installed during the week?

What is 1925 tiles?

300


A load of 18,000 pounds of rebar was delivered on Monday. The following amounts were tied in place per day: Monday: 2,200 lbs, Tuesday: 3,490 lbs, Wednesday: 1,745 lbs, and Thursday: 4,225 lbs. How much was left to tie on Friday?

What is 6340 lbs?

300

According to the blueprint, 18 anchors are needed at each of 28 column connections. What is the total number of anchors needed?

What is 504 anchors?

300

On a CMU building, there are 448 wall braces to be installed. If each of the 32 bays gets the same number of braces, how many braces are installed per bay?

What is 14 bays per day?

300

Convert decimal 0.12 to fraction.

3/25 

Remember your decimal should be reduced from 12/100.

400

The concrete crew plans to pour five pads at the same time. The closest loading point to the five pours is 125'. Each pour is an additional 35' further from the closest pad. What is the distance of the furthest pad?

What is 265'?

400

A BAC Craftworker can retire with a full pension when 85 points have been accumulated (points being age of the member plus years of active service). If the member starts at age 18 and works until age 50, how many points will have been accumulated? 

What is 82 points?

400

Two apprentices shake out 247 #5 reinforcing bars that are 22' long. Each bar weighs 2 pounds per foot. How much do all of the bars weigh together?

What is 10,868 lbs?

400


Last year, a Pointer-Cleaner-Caulker made $42,600 working at a rate of $24 per hour. How many hours did he work last year?

What is 1,775 hours?

400

The area of a circle with a 14-foot diameter is _____.

153.86 sq ft

500

 A BAC apprentice works 8 hours on Monday, 9 hours on Tuesday, 6 hours on Wednesday, 2 hours on Thursday (rained out), and 8 hours on Friday. What should the apprentice expect to see on the weekly check for the total number of hours worked? If they earn $27/hr what would their pay be before taxes?


What is 33 hours and $891?

500


At the end of a three-year apprenticeship, Frank has worked a total of 4,832 hours. The first year, he worked 1,621 hours. During the second year, 1,497 hours are worked. How many hours did Frank work in the third year?

What is 1714 hours?

500

What is the perimeter  of a hexagon if each side measures 125 millimeters

What is 750 mm

500

A starting apprentice needs 650 hours of work to become insured under the union's plan. How many complete 40-hour weeks will have to be worked before the apprentice is insured?

What is 17 complete weeks?

500

The volume of a triangular prism that has a 6-inch base, a 2-inch height, and a 4-inch depth is _____.

24 cu in 

Remember volume is cubic.