Contract Review
Peggy Hand Slaps / Contract Review
GE Booth ISO
TSS Knowledge
100

If completing a goodwill order what needs to be done before flipping?

All shipping details needs to be removed from account & order needs to be changed to free freight.

100

What do you do if you receive the message "The customer PO number is a duplicate. Do you want to append a sequence number to the PO?"

STOP! Check that the order wasn't previously entered.

100

What should you do after flipping an order with SS tags on it?

Send an email to tags@gebooth.com

100

Can you provide the part description for the below SSP fitting?

ISSD4ME4

Stainless Steel, male elbow, 1/4" x 1/4", tube fitting

200

If the customer sends in a PO and the terms are NET60 on their PO. In P21, the customer is setup for NET30 terms. What should be done?

TSS should ask for a revised PO

200

If a customer has a special shipping instruction, i.e. pulling shipping labels from a 3rd party, etc.

What should be done?

The process needs to be followed! 

A note needs to be added in customer master inquiry, as well as a temporary work instruction document completed and saved in the ISO folder.

200

If there is an issue with your production order would should you do?

Fill out the production order form. Let them know if it will be fixed within one week or an extended period of time. If it is an extended period of time let the team know to put the items back into stock.

200

What are the three most common Samson 3277 sized actuators that we sell?


HINT: We stock these actuators

3277-120

3277-175

3277-350

300

What is the first and most important step of contract review / order entry?

Entering and starting with the BILL TO!
300

A customer sends a PO to GEB for Reotemp items and addresses their PO as the following:

Endress Hauser C/O George E. Booth

What should our procedure be?

Ask the customer to revise the PO to be made out directly to George E. Booth Co.

300

Why is it important in the order entry process to select the correct warehouse location?

(101/102/103)

It makes sure the cost is pulled from the correct location. Helps the warehouse track inventory and cost associated with moving inventory.

300

What Worcester valve would you recommend?

1/2", Hygienic TC connections, ss body, modified Teflon seats & seals


HINT: AN ITEM WE STOCK

05WK706666TFMTTC

400

If an order ships collect what parameters need to be changed in the ship info tab?

Bill Recipient / Free Freight 

400

If you notice a PO is PDF edited or looks "off" what should be done? 

This usually comes with an email address from a different email address mimicking another company. These PO's are usually for large amounts of $ that seem very "easy"

NOTIFY MANAGEMENT. BETTER SAFE THAN SORRY

400

DOUBLE JEOPARDY! 

Please complete contract review on the provided PO!

Brian/Peggy would be proud!

400

What flow meter would you recommend for hot steam condensate? Temperature: 250F

Promag P

500

What do you think are the most common contract review mistakes? Why do you think they happen? How can we improve as a team?

Goodwill orders have to reflect free freight

TERMS not matching

Part numbers not matching

Incorrect BILL-TO account (starting at the ship-to)

Tax needs to be charged manually if needed

Incorrect SHIP-TO

500

What needs to be done if a customer sends in a PO that includes tax as a line item?

TSS must double check in the tax section that the "tax" box is checked. After checking the box, the correct tax percentage needs to be added according to where the order is shipping.

500

When signing off a warehouse production order what are some key things that need done/checked?

  • Verification of Selected Components
  • Valve Fail Open/Fail Closed Check
  • Valve Port Alignment Check
  • Tag Part Number Verification
  • Mounting Kit Tightness Verification
  • Mounting Kit/Lockout Pin Orientation Check
  • Tubing Connection Check
  • Tubing Length Check
500

When crossing over Promag 50 H models to Promag H 300's what is the biggest thing to remember / look out for? What should we let the customer know?

The lay lengths are different! 

You can order the process connections separately to secure the same connection lay length.