How many months after PTO of original system do we need before we can proceed with an add on system?
12 months
What is the max system size we can build to before an additional homeowner's insurance policy is needed?
11.7
What are the 4 teams in Sales Ops
Contract Writing, Communications, Timeline Management, Document Processing.
6
Who is the CEO of Trinity Solar?
Tommy Pollock
What is the minimum system size for an add on panel?
2.025
In Connecticut, what is the max AC system size we can have if there is less than 12 months of usage on the electric bill?
9
Lauren English (SR. Director), Mae Yenger, Jess Tauscher, and Vicki Broszeit
Pennsylvania
What year was the company founded?
1994
Can we add panels to a roof with existing panels that is not following setbacks rules.
No, we would have to design on an empty roof.
How many panels can we use on a 10K inverter in Massachusetts?
What stages of a deal does Sales Ops work with?
Stage 2 through Stage 10
290 degrees to 70 degrees.
Trinity was not always a Solar Energy Company, what industry was the company in before solar?
Heating and air.
For One Energy Companies (Met-Ed, JCPL, Penn Power, Penn Elec, West Penn Power) how many months of electric bills do we need for an add on system.
12
For Atlantic City Electric, what is the inverter calculation?
Annual usage/ 1.2
Who is the manager of Communications and who is the manager of Document Processing?
Comms- Scott McDermott. Document Processing- Luke Grady
What is the AC system size for a 5 (405watt panels) system?
1.450
What year did Trinity enter the solar industry?
2004
In New Hampshire, what is the max offset we can build to before approved is needed and who can approve this?
1.80%
2. Christian Toebe and Kevin Erbe
What does TSRF stand for?
Total Solar Resource Factor
We have over ______ installs.
100,000