GAF
Contract PPWK
SCOPES
CONTRACT APPT
CONTRACT ADMIN
100

What is a multi-layered asphalt shingle?

 architectural shingles

100

how many contract papers do we have

3

100

what scope has <> on it

acv

100

how long is our workmanship warrenty

1 year

100

What is the Approved W/ Scope column for?

To set up the contract appt with the HO

200

what kinds of shingles have a 50 year transferable warranty?

grand sequoia

camelot 2

uhdz

hdz

200

how many installation guidelines are there?

17

200

what type of scopes depends on roof age

RPS

ACV

200

you are ready if you have these items

yard sign

contract paper

receipt book 

shingles samples


200

after you sign the contract and get the payment who do you tag and what status does the job go in?

Breck and Signed Contract status

300

how many colors does HDZ, UHDZ come in

14

300

how many times does a HO need to sign during a contract

3

300

what scopes can you identify from the line-item page

ACV


300

what are 3 things we are not responsible for

covering/ tarping pool, damaged shrubs, reattaching satellite, damage to driveway, damage to drywall, etc.

300

What is document does Breck get prior to us scheduling a job that informs the city that we are doing work?

Roof Permit

400

This premium asphalt shingles with enhanced wind uplift resistance, algae protection (25‑year StainGuard Plus Limited Warranty)

HDZ

400

If a check bounces, what is our processing fee that is added?

$150.00

400

when there are more than one payment pages to get the final numbers on the contract paperwork

add like value 

400

what are thing that HO can discard off the roof (3 things)

satellite

swamp cooler

whether bane 

  

400

If your HO told you specific install dates they do NOT want their install, who should you tag in the job?

Skylar

500

How would you answer a HO when they ask why designer is more?

More materials are used to create it that creates a heavier shingle to resist wind and hail impacts and for the specialized look. 

500

on our contract after 30 days what % late fee is added per month?

5% every month

500

what section on a payment page has the final numbers to use?

summary for all payments


500

if the mortgage name is first on the check what does that mean

the mortgage has to endorse it before the HO does

500

What is needed if we are supplementing solar?

Confirmed solar panel count and/or solar agreement