CoorsTek has this many cardinal rules.
What is ten?
Emergency muster point
What is the south parking lot?
What is 9th St?
This is the acronym for a safety data sheet.
What is an SDS?
This is the first step of Foresight.
What is "what am I about to do?"
This should be used when working at heights of greater than 4 feet.
What is fall protection?
Our onsite occupational therapist
Who is Natalie Ohlson?
Person accountable for your safety
Who is myself?
Required for a secondary container
This is the type of Foresight you would do if you were performing the task for the first time.
What is a high risk task Foresight?
This is the last step of a lockout procedure.
What is try out?
9th Street has this type of air permit
What is a Title V?
Transformation Toughened Zirconia
What is TTZ?
Pictograms tell you this about a chemical
What are the hazards?
This is the second step of Foresight.
What is "what can go wrong?"
What is a 4-gas monitor/meter?
There are gas monitors for these two gases in the basement of 9th St.
What are ammonia and hydrogen sulfide (H2S)?
Year the Grand Junction facility was built
What is 1977?
What is 16?
Foresight is considered to be one of these.
What is a risk assessment?
Place to dispose of an empty aerosol can
What is a universal waste container?
Amount of wastewater outfalls at 9th St
What is two?
What is ISO:9001?
This program is used by CoorsTek to manage SDSs.
What is HSI?
What is stop the job?