Miscellaneous
Site Selection
Mix Bag
SIV & SS&R
Mix Bag
100

What is the name of BI's eISF?

Clinergize

100

What document will you receive prior to conducting a SQV?

Site Feasibility Questionnaire (SQF)

100

How many SOPs do we currently operate under in Site Monitoring?

100

What is the name of the document that captures training requirements for the site staff?


The Trial Training Plan

100

If there are no STORM documents for the compound what document do you complete if there is a temperature excursion at the site?

The Product Device Complaint Form is completed

200

What are the 3 levels of documents in the TMF?

Trial, OPU (Country), and Center (Site)

200

Only general SQV training is required for CRAs prior to conducting a trial specific SQV  ( True or False)

False: Trial specific SQV training is required before conducting trial specific SQVs

200

CRAs must reconcile the TMF against Clinergize? (True/False)

False-   RDR (SCR) group does this.

200

What is the name of the document that captures training requirements for BI staff

The Trial Training Plan

200

The documentation of all IMP delivered to the site, used, unused and/or destroyed must be verified and reconciled on unit (e.g. capsule, tablet, vial etc.) level. Is this True or False?

True 

300

Who at BI works with site staff during the start-up phase to ensure regulatory document completion prior to the SIV?

SRC (Site Release Coordinator)  aka Regulatory Document Reviewer (RDR)

300

If a site qualifies for a SQV waiver, there is no need to conduct this visit?  (True/False)

False- A SQV waiver approval waives the need for the visit to be completed on-site. The visit must be completed but maybe conducted by phone.

300

Who completes the Site Release Checklist?

The CTM

300

The SIV must be completed within ____ business days from the date of completion of the Site Initiation Checklist.

10 days

300

What is the minimum frequency for a site to record min/max temperatures of a medication storage location?

At least once a week

400

Who informs site/investigators of decisions regarding site selection?

CTM

400

Who gives the approval for an SQV waiver?

CTM

400
Who completes the Site Initiation Checklist?

The CTM

400
Who has to complete the Source Data Status Report during the SQV?

The CRA

400

What form do you complete if the site informs you that they have satellite sites?

Satellite Checklist

500

BI requires all investigators to complete ICH/GCP training within ________years prior to _____ and the training must meet ______________ criteria

3 years

SIV

TransCelerate criteria

500

Do we need to have a contract and budget in place prior to conducting SQV?

NO!  CDA.

500

Which checklist(s) must be completed prior to conducting the Site Initiation Visit (SIV)?

Both the Site Release Checklist and the Site Initiation Checklist must be completed prior to SIV

500

Within how many business days do you have after a monitoring visit to submit the visit report, get it approved by the CTM, finalize the report, & complete the visit in MySites?

10 business dates

500

Which two IRTs are currently used at BI?

Almac and Parexel Perceptive