Work Categories
PCI / Construction Drawings
Traffic Control
Little bit of everything
Who Knows
100

What work priority does Preventive Maintenance (PM) fall under?

2A

100

PCI stands for what?

Pavement Condition Index

100

TCD stands for what?

Traffic Control Devices

100

What is the standard field mix for concrete?

1 cubic foot of Portland cement 

2 cubic feet of sand

3 cubic feet of gravel (base course)

maximum of 6 gallons of water

100

Which student has the best chance of making TSgt?

Everyone 

200

True or False. Emergency work is scheduled work requiring response to sustain or ensure continued mission operations, prevent significant additional damage to facilities and infrastructure or protect the safety and security of the installation, mission, or personnel?

False.

It is UNSCHEDULED.

200

True or False. Pavement Condition Index (PCI) is a numerical rating which indicates the type and severity of the inspected distress?

True

200

Warning signs are what colors?

Black lettering on orange background

200

What are the Five soil characteristics?

Strength

Resistance to Frost

Drainage

Plasticity

Cohesion

200

TSgt Altfillisch is OCD about what?

Cleaning

300

What flight must prioritize, execute, and track work in accordance with AFI 32-1001 Civil Engineer Operations?

Operations Flight (3E6's)

300

True or False Lines are the most complex symbol on drawings?

False most basic

300

What are the minimum dimensions of the Type 3 barricade?

5'x4'

300

What are the Five purposes that prime coat serves?

Waterproofs the surface

Keeps water from seeping upwards by plugging the voids

Bonds loose soil particles

Hardens the surface

Bonds the base course to the newly placed asphalt

300

What religious domination did TSgt Ritchey grow up as?

Christian

(Not really Amish)

400

What priority does All other Enhancement work fall under?

4B

400

The Pavement Condition Index (PCI) is outlined under what UFC?

3-270-05/06

400

The termination zone is usually how long?

100'

400

What are the Five phases when rolling freshly placed asphalt mix?

Transverse joints

Longitudinal joints

Breakdown

Intermediate

Finish

400

How tall is MSgt Thomas? (Be Specific)

A tad taller than a hobbit.


500

How many work priority categories are there?

Emergency work, Preventive maintenance, contingency projects, scheduled sustainment work (High, Medium and Low), Scheduled Enhancement work, All other Enhancement work.

500

What are the three most common architectural drawings?

Concept, Site, Construction

500

What determines how much advance warning will be required in Stage 1?

Speed of traffic

500

The hole diameter should be how much larger than the diameter of the dowel?

1/8"

500

What is the make, model and color of MSgt Thomas's vehicle

Ram 1500 silver