TRS
ERS
RS
MISCELLANEOUS
100

WHAT IS AN AK0 AND WHAT NEEDS TO BE FILLED OUT WHEN PROCESSING AN AK0 IN THE NIS/NC MAILBOX?

AN AK0 IS A REQUISITION THAT DOWNS THE AIRCRAFT AND IS CRITICAL FOR THE AIRCRAFT TO FLY.

TECH EDIT SHEET

100

WHAT DAILY REPORTS DOES ERS WORK?

INCOMING/OUTGOING INTERFACE

SUSPENSE

NO STATUS

SCRL ( STOCK REVIEW CONTROL LISTING )

100

WHAT ARE THE RS DAILY REPORTS?

OUTSTANDING DTO WITH ON-HAND QUANTITY

BROAD ARROW

100

WHO ARE THE V22 CIVILIAN REPRESENTATIVES?

MR.BRYCE

MR.GUY

200

WHAT ARE THE TEC CODES WE SUPPORT?

AHXD - H53

AYNE - V22

200

WHAT IS A AS1, AS8, AND AB1?

SHIPPING STATUS

200

WHAT IS THE AMSRR?

EVERY PRI 03 REQUISITION ON ORDER IS PUT INTO A SPREADSHEET AND UPDATED DAILY INSURING THE SQUADRON HAS THE MOST UP TO DATE STATUS ON THE REQUISITION THEY HAVE ON ORDER.

300

WHAT ARE THE 5 REASONS A REQUISITION GOES OFVAL?

HIGH DOLLAR VALLUE, ARRC/LMC, EXCESSIVE QTY, PEB, HAZMAT

300

HOW MANY DAYS UNTIL YOU SEND A FOLLOW UP (AF1) ON AN EXPIRED DOCUMENT?

3 DAYS FOR PRI 01-08

7 DAYS FOR PRI 09-15

300

WHAT IS A ZF7?

A PROJECT CODE REQUIREMENT FOR THE TEST BENCH.

300

WHAT IS THE O LEVEL, I LEVEL, AND D LEVEL?

O - ORGANIZATIONAL (SQUADRONS)

I - INTERMEDIATE (WORK CENTERS)

D - DEPOT (EXTERNAL ENTITIES EX. DLA, BELL BOEING. ETC)

400

WHAT IS AN FGC?

FAMILY GROUP CODE

400

WHAT IS THE DIFFERENCE BETWEEN THE INCOMING AND OUTGOING INTERFACE?

IMCOMING INTERFACE - ALL STATUS COMING INTO NALCOMIS FROM THE EXTERNAL, WHEN THE SYSTEM DETECTS AN ERROR IT GETS PUT ON THIS REPORT AND RESEARCH IS MADE TO CORRECT THE DISCREPANCY

OUTGOING INTERFACE - WHEN AN A0A IS NOT POSTED IN R-SUPPLY 

400

WHAT IS A LATSUP (LATERAL SUPPORT)?

WHEN A REQUISITION WE ORDERED IS STILL SITTING ON BACKORDER (BB) WE WILL REQUEST THE STOCK FROM A SISTER MALS IN ORDER TO FULFILL THE ORDER. THE REQUISITION WE ORDERED WOULD THEN GO TO THE MALS WHO PICKED UP THE LATERAL SUPPORT

500

WHAT IS AN SM&R CODE?

SOURCE MAINTENANCE AND RECOVERABILITY

500

WHAT IS THE DIFFERENCE BETWEEN A IPG CRITS AND IPG I NON CRITS?

IPG I CRITS ARE O-LEVEL REQUIREMENTS

IPG 1 NON CRITS ARE I- LEVEL REQUIREMENTS

500

WHAT DOES RESCREENING A REQUISITION MEAN?

WHEN STOCK BECOMES AVAILABLE ON OUR SHELF BUT THERE IS A REQUISITION THAT IS CURRENTLY REFERRED INTO THE EXTERNAL, WE CAN THEN FULFILL THAT EXTERNAL REQUISITION WITH THE STOCK ON HAND