Acronyms
Org Chart
Projects
Workplan
What the Fund
100

Project Development Team

What is PDT?
100

Responsible for permit applications, biological studies, and long-term mitigation, don't forget to send them your project footprint.

Who is Environmental?

100

The big one, the whole enchilada, this planned whopper of a project would be the largest project in the district's history.

What is Pitt River Bridge?

100

When Clint tells you to "get the red out" it means this number is higher than your budgeted amount.

What is EAC?

100

These types of projects are funded by the State Highway Operations & Protections Program and make up the bulk of our project delivery.

What are SHOPP projects?

200

A change management tool. If your performance measures change for the project's anchor asset, you'll need to submit one of these to the CTC.

What is a PCR?

200

This unit is responsible for pulling specs, quality control, and submitting for advertisement.

Who is Office Engineering?

200

I-5 in Anderson looks a little wider since 2020. This all-hands project was designed in 6 months, but brought the interstate to 6 lanes.

What was RASL?

300

Not to be confused with light-reflecting shapes, this program provides resource tracking and schedule management for your project.

What is PRSM?

300

This unit holds many responsibilities - one of them being liaison between maintenance and project development. Don't forget to include Rick to your PDTs.

Who is Maintenance Engineering?

300

To improve intersection safety this will be the first Caltrans designed roundabout constructed in District 2.

What is A13 Roundabout?

400

Its a report which document hydrology and storm water treatment. It is produced by Hydraulics or Design and is required for PAED.

What is a SWDR?

400

PCRs, G12s, RMP Certs - you name it, they're here to help with all things PPM.

Who is PMSU?

500

With 3-6 month lead times, make sure this gets requested with enough time to meet PAED. You'll need the 9-phase estimate it includes.

What is a RWDS?

500

They'll provide topo, aerial photos, and pothole XYZ locations - just send them a request through their online portal.

Who is Surveys?

500

An oldie but a goodie: a realignment of this mountainous pass consisted of several projects, which in total moved over $1M cubic yards of dirt.

What is Buckhorn Summit?

500

Make sure there is enough time to include mitigation monitoring and let Kris Lloyd know if you change this date, it is a milestone to end project expenditures.

What is M800?