Project
Procurement/Budget
Clients
MEQ
Bonus
100

What is our current largest active project in Equipware (excluding IU Health)

What is Bed Tower

100

True or False: Preliminary budgets are always perfectly accurate

What is you wish 

100

Which client do we currently have the most Active Projects with

Who is Baylor (11)

100

What does MEQ stand for

What is Medical Equipment

100

Who Runs CTS

Who is Marty


(I'll also accept Anissa)

200

What Manufacturer/Vendor has CTS purchased the most MEQ from (Based on current Active Projects)


Who is Philips Healthcare


200

What system does Baylor use to issue and track requisitions


What is Ivalua

200

Which client gets mad at Josh Barnes for only giving 99.9% of his blood, sweat, and tears to their projects

Who is Northwestern

200

What Category of Equipment is ordered most by QTY?

What are Receptacles/Wastecans - 2223

200

Who sits diagonal from Paula

Who is Kofi

300

How many active project(s) does CTS have

What is 27 projects


300

How much does the current most expensive room cost

What is Monitoring, Telemetry (New Building) ($14,909,127)


300

Which client is the furthest from civilization

Who is Sage Memorial

300

What category of MEQ is the most money spent on (excluding Allowances)

What are X-Rays


300

What year was CTS Launched

What is 2016

400

Which project did Benn/Manuel get to enjoy sub 20 degree daily weather while Anissa was living it up on the beach in Florida with Erick

What is Northwestern Central Du Page ENT

400

How many requisitions have been issued across all active projects

497 Reqs

400

What is the current sum of all active Baptist Projects

What is  $121,773,594.69

400

Where does most equipment live by qty:

Bonus: where does the most equiment live by cost:

Portable

Mobile (casters/wheels)

Pole

Wall

Special

Floor

Bracket | Wall

N/A

Countertop

Freestanding

Ceiling

Surface

Cart

Floor | Wall

Table

Casework

Unassigned

What is the Wall (15,673 items)

Bonus: what is Mobile/Caster/Wheels ($70.382,141)

400

How many members are on the CTS team

What is 20 team members

500

What is the total amount of new items across all active projects


Bonus: What is the total amount of unique items

What is 56,489 items

500

What is the current total of all active projects


What is $324,338,386

500

What is the current sum of all active Baylor Projects


What is  $169,413,269.66

500

Which Architectual Group has the most MEQ items by QTY

01-Fixed Equipment 

02-Movable Electrical 

03-Movable Non-Electrical 

04-Instruments 

05-Furniture 

06-IT Computers 

ALL 

COM 

Unassigned

What is 03-Movable Non-Electric with 27,798 items


500

In what month did Benn join Hoefer Welker

What is March