QUOTE REQUEST
INSTALLS
EQUIPMENT
LEADTIMES
PO REQUIREMENTS
100

Who do you reach out to for a freight quote?

Customer Service

100

What is the purpose of a site measurement?

To create a template for fabrication the tops within 1/16th of an inch accuracy. 

100

How many ranges can fit into a 96" table?

5 ranges

96/17.5 = 5.48 (round down to nearest whole number)


100

What is the standard lead time for a frost top?

4-6 weeks from receipt of PO and signed shop drawing 

100

What are the 4 standard requirements for a table to enter production?

PO

Colors (stone and cabinetry)

Deposit

Signed Drawings

200

What determines the discount for a quote request?

The Dealer. We need the first and last name of the dealer.

200

What type of document/attachment is required to quote a custom install?

project drawings

200

Why can we quote exposed frost tops in tables, but NOT as a stand alone item?

The exposed frost top is made by ATLAS, which dealers can buy directly.

200

What is the standard lead time of the ICS234-18?

4-6 weeks from receipt of the PO, and laminate color confirmation

200

What information is needed for the coordinators to order Smartstone?

Color and finish

300

Name a table style that does not work with frost tops?

QS7230

NESTING TABLE

HERITAGE TABLE

CURVED LEG

NAPER

ELEMENT

(OTHERS CAN BE ENCLOSED)

300

Name 3 things the Smartstone installers do not install

Cabinetry

Plumbing

Electrical 

Fans

Sneezeguard glass

300

Why do we require 4" between ranges?

For the integrity of the smartstone and to make room for a chafing dish.

300

What is the standard lead time for permanent Versa-Gard sneezeguards?

4-6 weeks from receipt of PO and signed drawings

300

Which of the following items require a deposit?

A. Frost Top

B. ICB234-18

C. Smartstone Slab

D. VG3-P-60

C. Smartstone Slab

400

What are 3 things missing from the request below?

Please provide a quote on the continental table with 4 hidden ranges, a plate shelf, and casters for Ed Don. We need this ASAP!


Cabinet Material (stain or laminate)

Dimensions

Project Name 

Dealer Rep

Table Edge Style

Power (120v or 220v)

400

Why would this project require a custom install?


Quantity 1 

165" x 30" x 34" H Communal Table

Smartstone top with wood edges

Smartstone in Oatmeal Polished

Low Line Laminate

(5) hidden ranges

(2) powerstrips

std crate

the table is too large to ship assembled in a crate

400

What height is needed for the following table?

8ft Classic table

Smartstone top with wood edge

Smartstone in Seashell polished

Special Walnut wood stain

(2) SM-261R

(1) AF350

(1) PM-2231

Std crate

36" Height Minimum (AF350)

400

What is the standard lead time for Smartstone that is out of stock?

12-16 weeks (Italy)

400

The following description is on your customers PO. Do we have everything we need to enter production?

(4) QSC6827 in Low Line laminate and Snow Polished Top 

No, The standard QSC6827 comes in a wood stain so this needs to be quoted as custom and cannot ship from stock. 

500

What information can the coordinators use to find old custom orders and quotes?

property address, project name, PO number, in house tracker

500

We have a custom install including a frost top and 3 ranges in California. We received the PO and Deposit 1 week ago. The installers can do a site measurement next week. Fabrication for this project has a lead time after site measurement of 2 weeks.

How many weeks remaining until we can complete the install?

6 weeks 

frost tops take 4-6 weeks to be made + 1 week of ground shipping for frost top to arrive in California

500

What is the minimum length and width for a table to be to fit the below?

(1) 48x22 Exposed Frost Top

(2) SM-651R


98"L x 30"W

L: 4"+48"+12"+12.6"+4"+12.6+4"+=98"

W: 4"+22"+4" = 30"

500

What is the standard lead time for a custom install?

There isn't one! It depends on the following:

- equipment

- completion of cabinets

- site measurement

- fabrication

500

What does "Ship by the customer" mean?

The customer schedules shipping via their own carrier and Spring USA does not handle logistics.