TECHNICAL DATA MANAGEMENT
TECHNICAL DATA MANAGEMENT
MAINTENANCE DATA REPORTS
AIRCRAFT INSPECTIONS
AIRCRAFT INSPECTIONS
100

What type of data is maintained in the CTPL?

What is, Technical Data.

100

PEMA system software will be updated no later than how many days after receipt?

When is, 10 working days.

100

How many different MAINT reports are there?

What is, 6.

100

The first inspection interval for inspections based on calendar time commences on the date of what?

What is, DOD acceptance check flight.

100

When aircraft return to reporting custodian upon completion of PMI, the new base date for special inspections performed as part of PMI will be when?

When is, The date aircraft completes SDLM (MISC History entry required).

200

Management of CTPL is the function of what Division?

What is, Quality Assurance.

200

How long must copies of TD/IRAC weekly summaries be maintained on file?

When is, 6 Months.

200

What does the MAINT-2 report show?

What is by aircraft BUNO, the total number of discrepancy hours limiting the equipment from performing its mission or function during the reporting period. This report also denotes equipment utilization.

200

First inspection interval of those inspections based on flight hours, operating hours, cycles or events accumulate prior to what?

What is, Navy acceptance.

200

What is the purpose of a Pre-phase Inspection Meeting?

What is, Prepare changes to Sequence Control Chart, including TD compliance, any additional maintenance requirements, and plan for replacement of SRC items and other required material.

300

How do you correct a deficiency in a Technical Manual?

What is, a Technical Publication Deficiency Report (TPDR).

300

Which website is the authorized source for NAVAIR Electronic Technical Manuals?

What is, NATEC.

300

What does the MAINT-3 report show?

What is, displays SCIR hours by mission category and AWM hours by reason codes summarized for a given EOC code and associated WUC during a reporting period.

300

When will a phase or engine major inspection be a requirement of SDLM or special rework?

When is, specifically requested by reporting custodian and approved by TYCOM and COMNAVAIRSYSCOM.

300

When is a plus 10% deviation not authorized?

When is,  LCF “LOW CYCLE FATIGUE” limited items have reached there assigned cycles or operating hours. Or when Structural Life Limited Items have reached their basic life limitations or would reach during the extension, as well as components prohibited by the applicable PMIC.

400

What is the deadline for incorporation of IRACs, RACs, and ERACs?

When is, 2 days of receipt.

400

What do PMS publications consist of?

What is, MRCs, SPCs, PMICs, SCCs, and standard rework specifications.

400

What does the MAINT-4 report show?

What is, shows mission capability and maintenance data for each MAF or WO submitted for a given EOC code and associated WUC by aircraft BUNO within Assembly Cd and ORG code.

400

When is Depot Level not required to accomplish special inspections?

When is, special rework is performed at reporting custodian’s site.

400

The certification of performance of turnaround and daily inspections is made on what?

What is, Preflight/Daily/Turnaround/Postflight Maintenance Record (OPNAV 4790/38).

500

What is the deadline for incorporation of formal changes, routine revisions and notices?

When is, 5 days.

500

What is used to establish a Technical Publication Library?

What is, Initial Outfitting List (IOL).

500

What does the MAINT-5 report show?

What is, data on DMMH or FLTHR for aircraft assigned to a unit during the selected reporting period.

500

What publication used for aircraft preservation when there are no MRCs?

What is, NA 15-01-500.

500

How long is a Turn around on an aircraft good for?

What is, 24 hours or until major maintenance is performed.