Which bridges between Gatineau and Ottawa are facing lane closures for the majority of the summer?
Champlain Bridge
Chaudière / Union Bridge
After Stage 2 LRT project is completed, what are the terminus stations of Line 1?
Trim and Moodie
Tallest Building in Ottawa?
The tallest building in Ottawa—Gatineau is the 45-storey, 143 m (469 ft) tall Claridge Icon located in Little Italy.
Planned 416 Interchange for Barrhaven South?
Barnsdale Rd
What are the development fees for a single detached home inside the greenbelt of Ottawa?
39 700$
The 8th tallest building in Ottawa/Gatineau region?
R.H. Coats
How many Zero-Emission Electric buses are planned to be in service by the end of 2027?
450 zero-emission buses
Tallest building approved for construction in Ottawa?
The tallest building approved for construction in Ottawa—Gatineau is the 65-storey, 234 m (768 ft) tall Trinity Station — Tower 1, part of the three-tower Trinity Centre located in Centretown West.
Location of the new Ottawa Police station in Barrhaven?
3505 Prince of Wales Drive between Strandherd / Earl Armstrong and Longfields / Rideau River Road.
What are the development fees for a 2 bedroom apartment in Toronto?
39 981
What is the current major project at Tunney's Pasture?
The construction of a wholly-new central heating and cooling plant.
Airport
Uplands / EY Centre
South Keys
Business District under development between Wellington and Gloucester, and Elgin and Bronson?
SoPA
What is the name and number of Ottawa's newest ward in Barrhaven?
Ward 24 - Barrhaven East
Who is the mayor of Ottawa?
Mark Sutcliffe
Which phase of Place du Portage is under renovation?
Phase 3
Construction cost of Confederation Line or Line 1 from Blair to Tunney's Pasture?
2.1 billion
Ādisōke
Where is the Autonomous Vehicle testing grounds?
Inside the greenbelt between Hunt Club and Barrhaven.
$1831
When is Centre Block planned to be finished and how much is it expected to cost?
Construction Cost of Stage 2 LRT?
4.66 billion
Name of the major 34 acre high density development project bordering the Ottawa River?
Zibi
When is the O-Train extension to Trim currently planned to open?
early 2025
Population of Ottawa based off Census 2021
1,017,449