Desk-Review
On-Site Review
ISO
HOTMA
100

WORK ORDER LOG/BOARD MEMBERS/REJECTION LETTER ALL LISTED HERE

WHAT IS ADDENDUM C 

100

A LIST OF THE PREVIOUS FISCAL YEAR'S ICs AND MIs

WHAT IS INCOME TARGETING REPORT

100

MUST ADVANCE THIS TASK WITHIN 7 DAYS 

WHAT IS OWNER RESPONSE RECEIVED

100

THIS $30.00 OR LESS ADJUSTED INCOME ERROR WILL CAUSE AN OBSERVATION

WHAT IS DE MINIMIS ERROR.

200

NOTED GFCI NOT OPERABLE/ PULL CORD DOES NOT REACH THE FLOOR / WINDOW BLOCKED

WHAT ARE EHS DEFICIENCIES

200

THESE HUD FORM 50059s/50059As ARE UNSIGNED BY THE TENANT BUT VALID

WHAT IS GROSS RENT CHANGES AND USE OF AN EXCEPTION CODE

200

COMPLETE TIME TO REVIEW OWNER RESPONSE AND CREATE ADDITIONAL ACTIONS LETTER

WHAT IS 13 DAYS?

200

PROCESSING INTERIMS FOR 10% CHANGES MUST BE INCLUDED IN THIS DOCUMENT

WHAT IS POST-HOTMA TSP?

300

ACTIVE REPAYMENT AGREEMENTS, MONTHLY VACANCY RATES, LATE RECERTIFICATIONS CAN BE ALL BE FOUND HERE

WHAT IS THE VOUCHER REPORT

300

THESE TEN METHODS, LISTED IN SECTION 7 OF THE 9834 CAPTURE MANAGEMENT’S ATTEMPTS FOR CHANGE.

WHAT IS ENERGY CONSERVATION

300

OUR TEN PERCENT LESS THAN 100 REQUIREMENT

WHAT IS RIGHT THE FIRST TIME

300

A TIC VERIFICATION FOR INCOME

WHAT IS SAFE HARBOR METHOD?