Design Bid Build
Design Build
Construction Management
IPD
Delivery Method Stew
100

Design-Bid-Build is typically associated with what main project driver?  

What is cost?  

100

Under Design Build, which party is responsible for both design and construction? 

What is the Contractor or Design Builder? 

100

At what phase of a project does a CM usually get involved?  

When is at or before the design development phase?

100

Under True IPD, the Owner, Architect, Contractor and major Subs share in this

What is risk and reward? 

100

In this delivery method the Owner typically holds the trade contracts. 

What is CM as agent? 

200

Selection of a DBB contractor is usually based on this factor. 

What is cost or low bid. 

200

Design Build is typically associated with what main project driver? 

What is time/schedule or speed to market? 

200

When the CM in a purely advisory role, acting as the owner’s agent with no direct construction risk.

What is Agency Construction Management (ACM)?

200

Under True IPD, who are the major signatories to the Contract?

Who are the Owner, Architect and Contractor? 

200

All other delivery methods originated from this OG method. 

What is Design-Bid-Build AKA: General Contract. 

300

In competitive bidding, this approach is typically used when developing a proposal. 

What is "when in doubt, leave it out?" 

300

This is a commonly associated disadvantage of using design build? 

What is the loss of architectural integrity? 

300

The price ceiling and where the CM assumes financial responsibility if actual costs exceed that amount.

What is Guaranteed Maximum Price (GMP)

300

What technological platform advanced the use of IPD?  

What is BIM? 

300

The industry association that advocates for the expanded use of Design Build.  

What is the Design Build Institute of America (DBIA)? 

400

The DBB contractor will typically get involved with at this project phase. 

What is the bidding phase? 

400

The commonly associated benefit of using design build for project management. 

What is one line of communication between Owner and Project Team. 

400

This method of selecting a Construction Manager emphasizes experience, personnel, past performance, and financial strength rather than lowest bid.

What is qualification‑based selection?

400

Level 1 and Level 2 IPD are also known as this

What is IPD-Ish or IPD Lite

400

level 1 or level 2 IPD include what standard delivery methods...

What are Design Build and CM?  

500

In a DBB project, this entity holds the trade contracts. 

What is the general contractor? 

500

Cost Plus and a GMP are known as what type of accounting in Design Build

What is open book? 

500

These costs, often reimbursable, include site staffing, temporary facilities, and jobsite operations rather than trade labor.

What are General Conditions?

500

What is the primary project driver of using IPD

What is Collaboration? 

500

The primary motivators of using IPD are this...

What are time savings, reduction of disputes, elimination of waste, cost efficiencies.