Purchasing
Engineering
Scheduling
Production
Installation
100

How do you make a new PO

What is - using the add PO function on the dashboard

100

How do we name all of our jobs?

first 3 letters of last name + filemaker number

100

What does the Preferred vendor check box mean?

This is a contractor that we have done business with for years

100
What is the current weekly cabinet capacity

$80k

100

What is the primary function of the installation manager within the "Circle" of valet's managerial departments?

Be the Glue

200

What is the SO2 portal used for

As a catch all for items that do not have matches with the material database & spec sheet
200

What drive can all the videos for training be found

Engineering drive

200

How many reminder's does a customer receive after initially scheduling?

3

200

How do you batch a job in cut rite?

Create a parts list, make a new parts list (name it), hit edit -> merge -> select jobs to batch -> Optimize

200

What is the only thing the install manager must do every time they go on site

Installation manager QC form

300

When do we enter an item in the material tab instead of writing a PO

When it is specific for a job

300

How do you find a cabinet to check how we have engineered it in the past?

Open the designer spec sheet -> Search the item -> Find the job number in the jobs processing folder -> review the job

300

What is the daily installation capacity?

$50,000

300

How do we order panel stock material?

Use the need to order button -> 3 weeks rolling -> create PO -> check PO for stock -> send to appropriate vendor
300

What are the three routine responsibilities of the install manager every week

Payroll, Reviewing jobs for the week, and printing all job packets

400

How do you find an item in filemaker - What fields do you search?

ctrl+F ->Invoice date ->Product Line - > Material tab

400

What are Valet's three primary joinery methods

Mod-eez clip, Confirmat screw, cam lock

400

When do we assign a 3rd guy to a team?

When the job can be condensed by one day with adding or when there is a long walk to unload material

400

What vendor does our Sommet series panels come from?

Chris at Hardwoods

400

What is the goal response time to a customer email before 5pm

2 hours

500

What table do you use to see how many of an item are in our pipeline

Materials table -> search by date

500
If a special order will arrive after the scheduled install date what do you do?

Email the vendor and scott to push up the date and use the at risk portal

500

What is the formula to predict sales for a future month?

Historical month sales, % increase/decrease from last year, sales in current month on current day

500

How do we determine mathematically if we need to hire another person within a department?

if total overtime for that department is greater than 30 hours

500

When we have an upset customer, how do we decide whether to email or call

TRICK QUESTION - ALWAYS CALL