Project Development Fundamentals
Project Development Process
Ins and Outs of EPC + O&M
Project Finance 101
Project Agreements
100

Inter-related system of nodes and links

What is the definition of infrastructure?

100

The amount of phases in the project development process

5

100

The three Front End Loading (FEL) stages before EPC bidding

What is Conceptual Design, Preliminary Engineering, Project Feasibility?

100

A form of finance that has been around since the 18th century

What is project finance?

100

True or False: It is best to set up a special purpose vehicle to insulate each project

True

200

Two of the four domains of development

What is Technical, Commercial, Social and Financial?

200

The document that will help you plan and navigate your project in development and into construction

What is the Project Development Plan?

200

As rule of thumb, anywhere between 4 to 10% of total project CAPEX

What is the total cost of engineering?

200

Liability and recourse are limited only to assets in the specific vehicle

What is non-recourse project finance?

200

Stage to start investing time and money into core project agreements

What is FEL-1/project pre-feasibility stage?

300

Firms or entities that are ultimately interested in purchasing infrastructure projects when they have steady cash flows

What is Pension and/or Insurance Firms?

300

The five phases of project development

1. Concept phase (FEL-1)
2. Pre-feasibility (FEL-2)
3. Feasibility (FEL-3)
4. Permitting and EPC Selection (BID)
5. Financial Close

300

Two EPC contract structures

Any one of: what is Fixed Price (Lump Sum); Cost Plus Fee; Guaranteed Maximum; Unit Price?

300

Metrics used to evaluate the financial viability of a project

What is IRR and/or MOIC?

300

A major risk typically faced in off-take agreements

Any one of: what is off-taker credit and performance; project performance guarantee; deadlines and off-taker approvals; project collateral support requirements?

400

Three “things” Ken (Alex) would like you to leave DevU remembering

What is Goal, Approach, Perspective?

400

The contract that must be well negotiated during development to mitigate countless construction risks

What is the EPC contract?

400

True or False: More Engineering = Better Defined Scope = Lower EPC Bids

True

400

Two options for debt in project finance

What are bonds and bank loans?

400

An item that will impact raising financing for projects and question the credibility of developers

Any one of: what are insufficient project documents; poorly negotiated commercial agreements; high project costs; major project gaps; etc.?

500

Producing documents as fast and as cheap as possible until deciding to either stop or continue funding

What is the fundamental objective of project development?

500

3 common pitfalls that happen during project development that cause delays in achieving FID

Any reasonable answer is correct (Ken to judge)

500

One common mistake when EPC price comes in too high

Any one of: what is go out for more bidding; changing technology; cutting contingency; self-performing; cutting costs that will affect performance and quality?

500

An action to address the perceived risk of new technology i.e., new technology risk

What is acquiring an independent engineer’s report on the technology?

500

A possible structure to engage legal counsel

What is budget-based billing; dead discount; portfolio approach; flat gee; success fee?