Authorities & Responsibilities
Failures
Metrics
FMEA Steps
IQ-FMEA Software
100

 The owner of the DFMEA

Who is the person responsible for the design

100

FMEA analyzes this number of concurrent failures

What is one?

100

In FMEA-MSR, technical risks are comprised of these three metrics

What are Severity, Frequency, and Monitoring

100

This DFMEA step emphasizes need for risk reducing actions

What is Action Prioritization?

100

In a system DFMEA, this type of data is entered at the left most point of the failure net

What are vehicle level effects?

200

This role can accept high risk AP

Who is the design group director?

200

Unintended vehicle level behaviors

What are failure effects?

200

This is used to characterize the need to reduce risks to an acceptable level.

What is Action Prioritization?

200

This is used to determine which DFMEAs will be conducted for a project

What is Selection Analysis?

200

When Effects, Modes, and Causes are linked together

What is a failure network?

300

Has technical responsibility for the DFMEA contents

Who is the design engineer?

300

The type of failure, the consequences of which are perceivable at the vehicle level

What is a failure mode?

300

This Severity rating corresponds with the degradation of a secondary vehicle function

What is Severity 5?

300

This tool is used to focus the FMEA on topics of importance to the participants.

What is a preliminary risk assessment?

300

This represents the scope of analysis

What is a structure tree / diagram

400

Has the authority to make decisions about the acceptability of identified risks and the execution of actions

Who is Management?

400

Fault detection time plus fault reaction time

What is the fault handling time interval?

400

When all identified risks have been reduced to an acceptable level.

When is a DFMEA complete?

400

Following risk assessment, when additional prevention or detection actions are applied

What is a Revision State?

400

This describes how the existence of the Cause or Failure Mode is revealed prior to delivering the design for production.

What is a Detection Control

500

Responsible for design verification planning, implementation, and reporting.

Who are Test Engineers?

500

This Severity Level in DFMEA correlates with QM in Functional Safety

What is Severity 10?

500

This is a limitation on the freedom of design decision

What is a non-functional requirement

500

This DFMEA step must be completed before FMEA-MSR can be applied

What is Risk Analysis?

500


Participants are recorded in IQ-FMEA by selecting these menu choices

What are "administration", followed by "teams and persons"

Correct answer gets:  DOUBLE JEOPARDY!