When working on the crossbelt, what is needed for orders going to a pack station in the 200's?
What is a tote
I want to see how many parts are available in 'Other 2' (Fargo). What command do I use?
What is HOM (HOME)
What is required to do before sending a fan part?
What is using a rubberband to hold down the cord and double bubble packing before placing parts in a bag.
Pick label has an inverted (Blacked out) Pack Station
What is a Repick
The wrong parts ended up in my bay
What is AB Move non inventory
The command is used to access the Pick Station Screen?
What is STA (Station)
I have too many parts to fit in my bin, what do I need to look at before sending parts away to another home location?
What is SOD (sales order detail)
I have a cut tape product with sprocket holes on both sides. What do I do before I cut my strip?
Place a mark with a sharpie marker on the end that is cut.
This is printed on my pick label if a customer ordered a Digi-Reel
What is REEL
I have multiple strips for an order for 234 cut tape parts. I have quantities of 20, 100, and 114.
What is Prepack for each quantity
When a pop-up appears in your ipick stating OUT OF DATE product, what needs to be attached to the package?
What is a green 'All that is available' sticker
I do not have enough parts to complete my order. I look on my inventory screen to see if I need to order more parts and I notice I have parts in motion. How do I find out when they were sent?
What is LAU (Log Audit screen)
BGA is another name for what?
What is Ball Grid Array
The command needed in order to make a correct prepack for a sample order?
What is NOPHONE
I do not have enough Tape and Reel stock
What is Move UP
When opening a tray in the MSL area, I notice there is no HIC card. What steps need to be taken BEFORE it is baked?
What is, count all the parts, make a new prepack, new bag with HIC card and Desiccant, seal.
I am out of Cut tape and I notice I have a full MTR in the back of my bin in my TR home. What command do I use to see if I can use the MTR?
What is FAM (Family screen)
The required quantity needed for a DigiReel with a pitch 4.
What is 10 pieces or more
I received all the parts needed for a label with an inverted (blacked out) quantity. All the parts are ready to go to the pack station. What happens to the label?
What is Duplicate Label
I need a continuous strip for my cut tape order. I do not have enough parts but I see I have a MTR available in another bay.
What is Part Transfer Move
What needs to be scanned before placing parts on the crossbelt?
What is the Station ID
What command or keystroke is used to go from the Inventory Subsystem back to the Material Transport Subsystem?
What is End or Ctrl F5
I need to see how many parts are in my Multi Piece Part on my iPick.
What is Swipe left on the display picture
I have too many boxes of parts to put into one tote. I need a second tote.
What is a Travel Request
I got a Part Transfer Move pick label. What 2 steps are needed?
What is double scan label to pick the parts as normal then do a Part Transfer Send