Marine
Packaging and Drumming
Common
Rail/Road
Tank Farm
100

ALWAYS stay out of the _______ in case of mooring line breaks.

Line of Fire

100

ALWAYS _____ any packaging that has grounding provisions

Ground

100

ALWAYS allow for _____ when blocking in liquid filled systems.

Thermal Expansion
100

ALWAYS place ____ under drop trailers prior to transferring materials into or out of the trailer and ensure chocks are in place and brakes set prior to movement of forklifts on or off a trailer.

jack stands

100

NEVER fill a storage tank above the ______

Maximum design level

200

______ stand in or place any part of the body in the looped bight of a mooring line or wire

NEVER

200

ALWAYS allow for _____ and vapor pressure when dealing with product above ambient temperature

Thermal Expansion

200

ALWAYS _____ equipment and piping prior to opening.

De-pressure


200

ALWAYS attach ____, to approved locations, during loading/unloading operations of flammable liquids and combustible dusts. 

Ground clamps

200

ALWAYS maintain a _______ in the vapor space above an Internal Floating Roof.

Non-ignitable atmosphere

300

ALWAYS ensure safe ship to shore _____ with acceptable slope and safety nets

Gangways

300

ALWAYS _____ and _____ equipment before putting yourself in the line of fire

De-energize and Isolate

300

ALWAYS provide ____ or ______ to prevent vacuum collapse of a tank or shipping container.

vent relief, pressure source
300

ALWAYS provide ______ at all road crossings and fouling points and store railcars inside the clearance markers.

Rail clearance markings

300

NEVER overpressure a storage tank by allowing ______ to flow into the tank

Excessive Gas

400

What is Brett's ambition? (Same as a few others from the intros)

To retire
400

If you are installing new packaging equipment, what safety assessment is required?

Machine Risk Assessment

400

ALWAYS perform ______ and ______ on hoses prior to use.

Visual inspection and leak check

400

ALWAYS store rail tank car and road tank truck manway gaskets in a _____.

Flat position (for example on a shelf)

400

Location where you can find primary DLTC contact for your site

500

Process Safety - Name of DLTC guidance document to help determine which scenarios to evaluate in LOPA 

Process Safety Scoping Aid

500

Who is listed as an inventor on 7 patents? 

Dave Veneziale

500

ALWAYS ______ to prevent surge pressure effects.

Close manual valves slowly

500

Who is getting married in Nov 2024? 

Mike Lucas

500

There are 3 levels of LPP requirements (Mandatory, Mandatory Retrofit, and Operational Mandatory). If I participating on a PSSR on a new project, what requirements, if any, would I review against the project? 

All