DMT Code Review Process
Moving Table Objects
DMT Stage Gate Review Process
DMT Deployment Process
DMT Handoff to Support Team
100

Informal code review is done via email. How is a formal review completed?

Meeting

100

True or False:  DML changes include updates to Xref tables.

TRUE

100

What does CAB stand for?

Change Approval Board

100

Which change process needs to be followed for changes done in weekly deployment windows?

Standard

100

Daily Double: What is included in deployment list? Soldiers being sent overseas; changes being deployed; every deployed object and any change mitigation; every change that is in production.

Every deployed object and any change mitigation.

200

Once code is ready to review who is responsible to notify the code reviewer?

Developer

200

What tool should be used to push up to different environments?

Visual Studio

200

Daily Double: What is a Stage Gate Review?

evaluation that takes place to authorize a project to move from one life cycle phase to another

200

When is the deadline for an expedited change approval?

Noon

200

What technology tool do the Apps Data Ops analyst use to hand over the deployment list to the CM support Team?

Email

300

Name the 2 of the 3 participating roles of the code review process.

developer, Peer, Manager

300

True or False:  Visual Studio cannot handle automated deployments.

FALSE

300

How many people are responsible for Stage Gate review coordination and facilitation?

one; a single individual the Critical Partner unless otherwise designated

300

Up to which environment can a developer deploy code on PIDPyper? UAT; SIT; TRN; PreProd

UAT

300

How does the VM support team acknowledge the hand off from Apps Data Ops Team?

Respond to the email.

400

Daily Double: What type of testing needs to be completed without errors before report is promoted to the next higher environment?

Unit Testing

400

Where should one perform a schema compare?

Visual Studio (via SQL menu item)

400

What happens once the Stage Gate review meeting is completed?

All results are shared with Business Owner, project team

400

True or Fales: During deployment process, team member manually performs deployment/integration testing. If defect is found, issue is analysis/resolved by Developer while going back through DMT Development Process. Change Approval needed for this to start.

TRUE

400

When does the assigned DMT analyst performs DMT Handoff to Support Process.

Once changes are in production.

500

What 2 of the 3 classifications of a medium code review complexity level?

Changes =11>25 columns and >=16<80 hours of work. Somewhat complex with minor calculations

500

What is the next thing one should do after a schema change gets pushed?

Use PIDPyper to import the metadata.

500

Name 2/3 possible inputs to a Stage Gate review

architecture review, baseline reviews, audits, cost & scheduling report, testing reviews

500

Name one of 2 teams the developer works with to determine scheduling of app on PIDPyper in deployment process.

App DataOps Group or Qlik group

500

What is included in a change mitigation?

Possible issues and resolutions affected or caused by a deployed object.