Foodservice Operations
Employment Standards
Fire Safety
Budget
Costs
100

This type of food service operation prepares all food in the same facility. 

What is a conventional operation?

100

Studies all aspects of job, done by worker and their supervisor

What is job analysis 

100

This fire class uses wet fire extinguishers and occurs from cooking oils

What is type K

100

This budget changes with business activity 

What is flexible budget

100

This cost is already incurred and cannot be recovered

What is sunk cost

200

This type of operation prepares their food in bulk, and then is frozen or chilled for storage/ later use. 

What is Ready Prepared?

200

This includes qualifications, skills, and attributes of an ideal candidate.

What is job speification?

200

This fire class is caused by flammable metals and used dry powder extinguishers 

What is class D

200

This budget projects revenue and expenses, showing inflow and output of cash. The purpose is to determine if funds will be available when needed

What is cash budget

200

This includes both fixed and variable components and includes labor, maintenance, and utilities

What is semi-variable cost

300
This operation used when food is produced in one area and then transported to a separate location for serving.

What is commissary?

300

This includes duties of a job, job title, and job summary

What is job description 

300

This fire class is caused by equipment fires and uses this symbol to indiate

What is class C and circle

300

This budget focuses on assets that will be used for longer than 1 year.

What is capital budget
300

This type of cost includes rent, tax, depreciation, insurance, interest and debt

What is fixed cost

400

This operation purchases food completely prepared. Also known as the kitchen less kitchen

What is Assembly Serve?

400

This term is used when upgrading jobs by adding motivational factors

What is job enrichment 

400

This is caused by gasoline, pain, petrolium and uses this symbol. 

Class B and Box

400
This budget starts with a baseline or previous budget and adjusts for current conditions

What is baseline budget

400

This is looked at first when reducing a budget and includes food, uniforms, repairs, and benefits

What is variable cost

500

A __ delivery system is where trays are set up close to production whereas as __ delivery system is used where there is a large distance to patient.

What is a centralized and decentralized delivery system?

500

How many FTEs are necessary for everyday performance 

1.55

500

This is used for combustable materials such as wood, paper, fabric and uses this symbol. 

Class A and triangle

500

This budget begins at 0 and all expenses must be justified

What is zero-based budget

500

This is the amount of increase or decrease in cost when you compare alternative choices

What is differential cost