What is BIM?
1- Building Integration Model
2- Building Information Modeling
3- Blueprint Infrastructure Management
2- Building Information Modeling
What is LOD 100?
1-The number of coffees you need to survive coordination meetings
2-The amount of hours spent trying to fix a broken Navisworks link.
3-Conceptual design
Conceptual design
What is used on construction sites for site surveying/progress tracking?
1-Scaffolds
2-Drones
3-Goggles
2-Drones
Technology that captures existing building conditions?
1-Infrared thermal imaging
2-3D laser scanning
3-Acoustic sensing
2-3D Laser Scanning
VDC activity helps identify and resolve clashes between different building systems
1-4D scheduling
2-Quantity takeoff
3-Clash detection
3-Clash detection
What is CDE
1-Common Data Environment
2-Cloud dedicated espace ,where all your files are floating in style
3-clubhouse data entity ,where BIM pros hang out and swap stories
1-Common Data Environment
At what LOD, a model is suitable for
fabrication and construction ?
1-LOD 256
2-LOD 400
3-LOD 750
2-LOD 400
What is the type of map created by stitching aerial drone images together?
1-Selfie from 300 feet high
2-A pizza pie chart of your construction site
3-Orthomosaic
3-Orthomosaic
Data type produced during a Scan-to-BIM workflow?
1-Point clouds
2-Floor schedules
3-Point Material takeoffs
1-Point Clouds
Tool visualize construction progress by overlaying 3D models onto real world environments .
1-Augmented Reality
2-Reality Show
3-PDF reader
1-AR/VR viewer
Which of the following best describes what a VDC Coordinator does?
1- Ensures coffee machines are fully stocked
2- Resolves clashes and build digitally
3- Teaches AI how to pour concrete
2-Resolves clashes and build digitally
What is asset/facility management
structured data delivery format?
1-MMS
2-FM
3-COBie
3-COBie
How many certified VDC drone flyers in Toronto & London area with ED:
1- 42
2-25
3-x
3-x
Software used to convert point cloud data into BIM elements?
1-Photoshop
2- Revit
3- Excel
2-Revit
4D BIM ,adds this type of data to the model:
1-schedule/time
2-recipe
3-age
1-schedule/time
The document that defines data exchange requirements between parties:
1-DND
2-EIR
3-IER
2-EIR- Exchange Information Requirements
LOD for clash-free coordination before construction begins
1-200
2-300
3-500
2-300
Drone data is typically processed using this type of software:
1-photography
2-photogrammetry
3-physiotherapy
2-photogrammetry
Which project phase benefits most from Scan-to-BIM accuracy?
1- Conceptual design
2- Renovation
3- Interior decoration
2-Renovation
What is cost/estimating in BIM?
1- Coupon clipping with Excel
2-5D BIM
3 – How much your Revit crashes
2-5D BIM
What is the international standard for BIM processes called
1- ISO 19650
2-ISO 19650 2
3- ISO 9001
1-ISO 19650
What is the US organization that
published the BIMForum LOD Specification?
1-GGG
2-ED
3-AGC
3-AGC
FAA regulations often limit drone flights to this maximum altitude .What is it?
1-266 feet
2-400 feet
3-1020 feet
2-400 feet
Technology sometimes combined with laser scanning for faster capture.
1-Pokemon Go: Construction Edition
2- SLAM
3-Revit families
2-SLAM (Simultaneous Localization and Mapping)
VDC approach uses real-time data to monitor building performance.
1-Technical Twin
2- Digital Grin
3-Digital Twin
3-Digital Twin