Policy and Procedure
Pumps
FDCs, Hydrants, and Fire Pumps
Running Route and Panels
Miscellaneous
100

SOG 104 dictates

Use of Government Vehicles

100

The quantity of 4" supply line on E750

1000' off the rear, two 25' short shots

100

The FDC locations on building 62

East (Charlie), West (Charlie), Circle, side Center (Charlie).

Fire Pump side Charlie center

100

Running route and panel for building 66

left out of firehouse, left on stokes, left into circle, panel in kitchen

100

The ground pads for apparatus on base are located here

62, 64, fisher houses

200

According to SOG 307 the driver/operator must complete these two things after being responsible for/at fault of a mishap or vehicle accident. 

EVOC and be removed for 30 days. 

200

The formula to find Pump Discharge Pressure (PDP)

PDP = FL + NP +/- EL + APP (+NDW20)

200

The minimum pressure and FDC should be pumped at.

*bonus, pressure that we prefer to pump them at

150

175

200

Running route and panel for 73

Left on E Palmer, Left on Stokes, Right on S Palmer, loop into parking garage, drop off crew and stage

Go through double doors to right of lobby, in the ID office, pass three office spaces

200

The order of Quarters on admirals row

Center is A. B,C are to the left of A. D,E are to the right of A. 
300

The SOG that dictates what qualifications are required for someone to become a driver/operator

SOG 308

300

The FDC Crosslay that is preconnected, and the total length and size of FDC Crosslay hose

Rearmost line. 3", two 100' sections

300

Locations of FDC, Pump, appropriate hydrant for building 52

Side Charlie

300

Running route and panel for 241

Right out of, right on Taylor Road, hold short on grounds road to layout from 203

Panel located inside front walkway

300

The locations of all solar panels on installation

*Bonus, the shut offs

62 roof, 64 roof, 68 garage, 87

400

The Local Driving Training Program requires these steps to become a cleared driver/operator

Complete:
Base a base map test
Regional Workbook
Street Lists
Local Workbook
Pass a 20 question base familiarization workbook
Pass a 20 questions hydraulics test
Complete a minimum of three practical evolutions with the BC

400

The reasoning for 5" soft suction intake on the front of E750

Maximize water intake on a restricted intake 

400

19's fire pump location, appropriate hydrant, and what is actually pumps

*Bonus, isolation valves

Side Charlie

Across the street

1, 2, 3, 5, 7, 19, 39 (if valve is open)

In ceiling above at gift shop. There are TWO valves. One for stairwell, the other to isolate 19 from the other buildings. 

400

The running route to 252 and the panel location

Right out of firehouse, right down the hill, pass 17 garage, first building on left (the boiler)

No panel

400

The standpipe connection on building 51

There is no standpipe in 51, the only connection on the building feeds sprinklers ONLY

500

These people shall be designated in writing by the District Fire Chief (related to driving/operating)

Driver Trainers

500

The first action a driver should take after charging a handline

Bump the primer

500

The FDC(s), Fire Pump, and most appropriate hydrants for building 1

North, South, Center (A), Center (C).

6th Floor, feeds down to 5 and up to top.

North well, South Well, Across the street from 19/North Well, Side C

500

The running route and panel location for building 4

Right out of firehouse, left, right onto rockville pike, merge onto 495, exit onto clara barton pkwy, right into gate 1 CRDR, right on Taylor Blvd continue until arriving on delta side to drop off crew for panel access.

Delta side, basement, model ship building area

500

The best access and hydrant for the building 9 electrical vault

*Bonus, same question for building 19

9: South well, do NOT park on top of the vault

19: Side Charlie