Disaster Management Cycle
BA IS SIC DRRR
TERMS TERMS TERMS
DRR YARN
DISASTER 101
100

A coastal barangay receives a typhoon warning three days before landfall. Families prepare go-bags and evacuate to designated centers. Which disaster management phase is demonstrated?

Preparedness

100

It is the process of planning and preparing for potential disasters before they occur.

 Disaster Readiness

100

It is a potential threat or danger that can cause harm to people, property, or the environment.

Hazard
100

It happens when a hazard seriously affects a community and overwhelms its capacity to cope.

Disaster

100

Heavy rainfall causes a river to overflow, submerging nearby communities. What type of disaster occurred? 

Flood / Flooding
200

After a major earthquake, rescue teams search for trapped victims and distribute relief goods. Which disaster management phase is taking place?

Response

200

The potential loss or damage caused by a disaster.

Disaster Risk

200

The weakness or lack of protection that makes people or places more likely to be harmed by hazards.

Vulnerability
200

Double Jeopardy:

A community receives early and accurate warnings about an approaching typhoon, allowing residents to evacuate safely. Which factor helped reduce disaster risk? 

Early Warning System

200

Strong shaking caused by the sudden release of energy along fault lines damages buildings. What disaster is being described?

Earthquake

300

Double Jeopardy:

A municipality plants thousands of trees and constructs flood-control projects to reduce future flood damage. Which disaster management phase is illustrated?

Mitigation

300

The presence of people, buildings, or resources in hazard-prone areas.

Exposure
300

Double Jeopardy:

A disaster exceeds the affected community's ability to __________ using its own resources.

Cope

300

The 1990 Luzon Earthquake had a magnitude of __________.

7.8

300

A chemical plant accidentally releases toxic gas, causing deaths and long-term health effects. What classification of disaster is this?

Industrial Accident

400

A family rebuilds their home and receives livelihood assistance several months after a typhoon. Which disaster management phase is this?

Recovery

400

Mitigation is to before a disaster as Recovery is to __________.

After Disaster / After

400

Volcano is to __________  as Flood is to Water Contamination.

Ashfall

400

Poor urban planning, deforestation, and poverty are examples of __________ and social conditions that increase disaster risk.

Political

400

Double Jeopardy:

Months of unusually low rainfall result in crop failure and water shortages. What disaster is described?

Drought

500

A barangay has trained volunteers, evacuation centers, and emergency supplies ready before disasters. Which DRRR concept is being described?

Capacity

500

Disaster Readiness is to preparing as Risk Reduction is to __________.

Lessen the impact

500

Double Jeopardy:

Tsunami is to underwater earthquake as Tornado is to __________.

Thunderstorm

500

The __________ Valley Fault is one of the country's active fault lines.

West

500

Double Jeopardy:

The 1991 eruption of Mt. __________ was one of the largest volcanic eruptions of the 20th century.

Pinatubo