Quality State
Retrospectives
Billing
Defect Management
Multiproduct Select
100

This Percentage Target is what we have set for DSP Availability. 

What is 98.5%

100

What continues to be an issue during almost all retrospectives? (Hint: Communication and OOT)

Team Members continue not to put their out of office in WorkDay and everyone's calendar.

100

Who is the main Cat Digital BR Accountant responsible for month end close processes?

Kusigh

100

What is our target application availability? Have we been achieving it? 

98.5%, Not for April

100

What is the planned production go-live date of Multi-product?

November 15, 2024

200

This new IT Control is being rolled out by Krishna this year

What is Job Scheduling?

200

What approval process was enacted from the June 2024 Retrospective that became a major workflow item today? 

Arun must approve an Engineering PO as a System Engineer before the Engineering PO can be assigned and reviewed during an MRD.

200

What system do dealers and customers pay their Cat Digital Billing invoice through?

SAP Financials Biller Direct

200

How many grade defect issues have been reported so far?

8-10

200

Who handed off to whom, the multi-product epic's product ownership last year?

Anand to Lavanya

300

This is the required timeframe for fixing a production defect with a severity of P3.

What is 4 sprints (or 56 days)?

300

What feature from June 2024 Retrospective was delayed multiple times because of an external application issue?

Feature 1248692 Include Global Dealer Codes to all Marine RFV Subscriptions  was delayed due to external issues

300

How much did Cat pay to use Zuora last year?

$890k

300

Double Points - What are our biggest releases this year (count of features)?

Mar01(29features), Feb16 (24 features), July26 (20features)

300

Will Multi-product functionality bring down the number of subscription combinations and bring down the catalog load? (True/False)

False

400

This is the required timeframe needed to fix a production defect with a severity of P2

What is two sprints (or 28 days)?

400

From July 2024 Retrospective, Engineering's issues with Priority 3 and 4 bugs was...

BLOCKER is marked for the bug that has priority 4 and severity 3 which is  not  even a blocker bug. The title on the bug is misleading and causing a lot of confusion. Ref bug : Bug 1497299: [BLOCKER] QA- DSP Allowing user to copy and paste the full text even if one character is copied

 

400

When does the Zuora contract expire?

10/31/2025

400

What is our release criteria for Prod deployments?

Reg: 0-0-0, NC: 0-0-3

400

Who is Multiproduct Field Follow coordinator?

Krishna

500

This is the timeframe requirement needed to fix a production defect with severity of P1

What is 14 days?

500

From July 2024 Retrospective, what was E2ET biggest concern (bug related)?

The Bug Triage process may need to be reviewed, at one point the bug were getting marked as RESOLVED for Internal Team retest, causing confusion for the E2E test team. 

500

How many products does Cat Digital Billing invoice for (MineStar legacy counts as 1)?

11, 

  • VisionLink, VisionLink Productivity, Remote Fleet Vision, Remote Asset Monitoring, Cat Grade Licensing, China Fleet View, MineStar Edge, MineStar Legacy, Equipment Insights, Technician Toolbox, VIMS Transmitter
500

In our latest release one of the features had issue with external team dependency and had to give a conditional GO. Can you name the feature/functionality?

B2C authentication

500

DOUBLE POINTS - What is the critical value that the dealer will get in the end application (like VisionLink) when multi-product is implemented?

reducing telematics data loss in the end user application by minimizing the need for Subscription cancellation just for the sake of switching to different subscription plans