Session 1
Session 2
Session 3
Preconstruction
Misc
100
5 million Dollars This is now increasing, but we need to be aware that these projects got us through hard times and require just as much effort as multimillion dollar projects
What is JED average project size
100
These costs in an estimate are known roughly as "job specfic overhead costs"?
What is General Conditions
100
This is a list where ideas are written during meetings that need to be discussed outside the current meeting.
What is The parking lot
100
This is one part of the Schematic Design Phase.
What is developing a floor plan
100
This is the name of the groups theme song
What is Turn it down for what
200
1.Owner 2.Design 3.Construction 4.Precon
What is/are the 4 areas that contingencies cover
200
The Self-Perform group uses they to track costs vs. budget and track how well we are doing.
What is Production Units
200
This is a comprehensive insurance policy through Zurich North America that pays for costs associated with subcontractor default.
What is Subguard
200
This is typically a preliminary site issue to keep in mind when preparing for a job.
What is Utility Availability
200
This is who won the baseball game at our June fun night
Who are the Royals
300
Site Specific Safety Plan This should be a collaboration effort between construction team with input from outside sources(ie, fire marshall) if nessacary
What is how we address specific jobsite conditions that are not covered in the corporate safety & health program
300
The name of the 3rd Party rental firm that JE Dunn has formed to rent our equipment
What is Blue Hat Rental & Hoisting
300
These are the four social medial platforms that JE Dunn currently utilizes for communications and public relations.
What are Facebook, Youtube, Twitter, and Linkedin
300
These are the 4 types of contingency.
What is Estimating, Construction, Owner's, Design
300
This is the person who won the fun award at the first session
Who is Eric Nickeson? Was there a front flip off the stage?
400
1.Superintendent 2.Estimating 3.QA/QC/MEP This will help to minimize scope gaps and use our resources to head of potential future issues.
What is who we should involve as PM's when writing scopes
400
The 2 most common types of geo-thermal in use today?
What is Vertical Well and Horizontal Well
400
This is a centralized database housing subcontractor prequalification information allowing JE Dunn Construction to understand and underwrite potential default risk.
What is Subcontractor Management System
400
This is the #1 thing an owner wants from us during Preconstruction.
What is Honesty
400
This is the person Mr. Dunn played tennis with
Who is Henry Bloch?
500
1.Honesty 2.Accurate Estimates 3.Treat Everybody Fair 4.Get the Best team on the job 5.Have a passion for what we do
What is what developers want from us
500
This category of the electrical field encompass a variety of systems including nurse call, fire alarm, security, phone, tv, etc.
What is Low Voltage
500
This is the strategic framework that guides an organization and its senior leaders to prepare for, manage, and recover from issues and adverse events facing an organization.
What is Crisis Management
500
These are the (5) phases of preconstruction
What is Programming, Conceptual, Schematic, Design Development, CD's
500
This was the main course at the first day of every Dunn 200 Course
What is bacon and egg sandwich?