This screen is used to assign working minutes to workdays.
What is MC01 (Calendar Master)?
These are the 3 life cycle flags (must include number and name).
What is 0 (MP), 1 (New Part), and 2 (Buildout)?
This is the standard workday setup for the G-Infra calendars on a weekday:
G-Infra Workday: On/Off
G-Infra Holiday: On/Off
Line Shop: On/Off
What is:
G-Infra Workday: On
G-Infra Holiday: On
Line Shop: On
This is used to calculate the time needed between dock unload and flowrack delivery.
What is Internal Lead Time?
This screen allows you to submit box minus adjustments against a part without altering the current day order calculation.
What is MD06 (Inventory Adjustments (Box) CTL (MINUS)?
This flag controls how e-Kanban orders buildout/ECI last order QTYs. Will round up, down, or order partial.
What is the fraction flag?
This is the setup for the G-Infra calendars on a *recovery* Saturday:
G-Infra Workday: On/Off
G-Infra Holiday: On/Off
Line Shop: On/Off
What is:
G-Infra Workday: Off
G-Infra Holiday: Off
Line Shop: On
This tells e-Kanban when and what vehicles are planned to be produced.
What is the Vehicle Virtual Line?
This screen allows you to check the orders for a specific part.
What is HR05?
This scrap setting will count up scrap to a full box, then order once the QPC has been reached.
What is 0:1?
This is the setup for the G-Infra calendars for a MTM observed holiday (ex: Memorial Day):
G-Infra Workday: On/Off
G-Infra Holiday: On/Off
Line Shop: On/Off
What is:
G-Infra Workday: Off
G-Infra Holiday: Off
Line Shop: Off
This function in e-Kanban increases logistics effeciency by helping supplier only ship full pallets.
What is box layering?
This screen allows you to check the timing of your planned orders and when it should hit certain tracking points.
What is MT01 (Time line Inquiry)?
This is the length of time that ECIs will remain in the system before being automatically purged.
What is 90 days (3 months)?
This is the setup for the G-Infra calendars for a planned production Saturday:
G-Infra Workday: On/Off
G-Infra Holiday: On/Off
Line Shop: On/Off
What is:
G-Infra Workday: Off
G-Infra Holiday: On
Line Shop: On
This is the most important part of TPS that e-Kanban prioritizes.
What is Heijunka?
This screen is where trial vehicles are loaded into e-Kanban to order carry-over parts for trials.
What is MX05 (Reject Vehicle L/O Timing I/P)?
This SAP function will cut orders up to the number of PCS entered, but will not carry over cuts greater than the calculated orders for that day.
What is PCS Minus adjustement in MD05 (Inventory Adjustment (PCS) CTL)?
This is the setup for the G-Infra calendars for an Apollo *planned production* Saturday and a Discovery *recovery* Saturday:
G-Infra Workday: On/Off
G-Infra Holiday: On/Off
Apollo Line Shop: On/Off
Discovery Line Shop: On/Off
What is:
G-Infra Workday: Off
G-Infra Holiday: On
Apollo Line Shop: On
Discovery Line Shop: Off
This is calculated by e-Kanban by using the install point (depth) to determine what cycle parts should be delivered on.
What is Order Range Lineside?