Definition-ongoing release of material to the environment (air, water or land)
Emissions
This is your last line of defense on the hierarchy of controls
PPE
This SWC allows the operator to have control over the flammables and ignition sources in their area.
Hot Work
A risk management system focused on eliminating fatalities and LAI's.
Personal Safety Management System
Management Leadership, commitment and accountability.
OIMS 1.1
A procedure provided for protection of individuals working on electrical circuits, electric motor driven equipment, equipment driven by steam or hydraulic pressure, or equipment containing other forms of hazardous energy.
Lock out Tag out
This is the management system that was implemented after the valdez for standardized safety throughout the corporation.
Operations Integrity Management System
If i'm going to be moving heavy items with a forklift around the site I should be using with SWC?
Working Around Mobil Equipment-WAME
quick and simple learning process that allows 2 way engagement between the leader and the team. It is based on 4 questions and takes ~10 minutes to complete.
AAR-After Action Review
Risk Analysis
OIMS System 2.1
a document that provides health and safety information about products, substances or chemicals that are classified as hazardous substances or dangerous goods. provide information on: the manufacturer or importing supplier.
Safety Data Sheet-SDS
This is a drawing of equipment that displays all equipment attached
P&ID
If i'm going to be working on a ladder or lift and i'm exposed to a potential fall of over 6 feet I need to consult with this SWC.
Working At Heights-WAH
A work condition associated with the work environment, the task or individual that makes error more likely
Error Prone Situation
Work Management System
OIMS System 6.4
Occurs when a critical device or system is take out of service (isolated, shut down, forced or bypassed) while the equipment or facility being protected remains in service
Temporary Defeat
Prior to starting a task if i envoke my slow brain and carefully think about the task prior to start I am performing a
LMRA
I need to power down a piece of equipment in order to make a repair. If i want to de-inventory the equipment and rid it of hazardous energy which SWC should i use?
Energy Isolation
Fatalities, maiming, and other injuries that severely impact daily activities long term.
Life Altering Injury (LAI)
Management of Change
OIMS 7.1
If on the job and I feel any type of pain or discomfort whom do i notify?
My FLS
If we are performing a task with LSRA potential which tool should we be using to discuss all the safety implications of the task?
PSMS
How many SWCs are there
12
Pre-planned interrupters which highlight last line of defense actions/steps. Used for key times by worker to determine if all necessary steps have been executed and necessary safeguards are in place prior to step being performed.
Hold Points
Third Party Services
OIMS 8.1