ECC POLICY
N.E.S.C. BEST PRACTICES
ECC FACTS
SAFETY FIRST
IS FIBER FASTER? OR ARE YOU JUST GETTING OLD? (Changes in Telecom Standards Over the Last 10 Years)
100

Employees must complete this after any equipment accident or property damage.

What is an Incident Report?

100

Rule 97 was written to protect communication lines and the public space the occupy by enforcing rules with regards to this specific weather event.

What is lightning? 

Rule 97 of the NESC specifies that:

"Communications and supply cables and equipment shall be protected against lightning and other overvoltages where there is a likelihood of such occurrences."

100

In January, Dycom recognized Ervin Cable Construction's unwavering commitment to safety by presenting President Brad Ervin with this.

What is the Golden Hardhat?

100

Backup alarms must be tested this often.

What is daily?

100

Though developed in the early 1980's, this tool used to cut fiber with a clean, flat end before splicing wasn't considered the standard until the mid 1990's.

What is a cleaver?

200

ECC prohibits this action while driving a company vehicle. Resulting in a suspension for the very first infraction

What is using your cell phone without handsfree?

200

This is the minimum required spacing between communication lines framed on any pole.

What is 4 inches? 

Rule 235C of the NESC specifies that:

"Communication conductors and cables on the same supporting structure shall be separated by not less than 4 inches."


200

In June of 2025, ECC celebrates and says congratulations this senior leader and Vice President on his retirement. 

Who is Keith Lingle?

200

Workers who drive any company vehicle displaying a DOT number must have at least this required document

What is a DOT Medical Card?

200

The most common fiber connector types are SC and this

What is LC?

300

The official ECC policy on harassment can be found in this document

What is the Employee Handbook?

300

The NESC states that down guys must be anchored at least this distance from public sidewalks.  

What is 3 feet?

Rule 235-1 of the NESC specifies that:

"Guy anchors should be installed no closer than 3 feet from the edge of a sidewalk, curb, or public walkway to prevent trip hazards and maintain ADA compliance."

300

ECC's largest FTTH project in 2023 was in this state.

What is Illinois?

300

Shoring is required in any trench deeper than this depth

What is 5 feet?

300

These two wavelengths are the standard for testing and certifying fiber optic networks

What is 1310nm and 1550nm?

400

ECC’s standard for acceptable driving records includes this maximum number of moving violations in 3 years.

What is 2 years?

400

The rule written in 2007 is the only time that fiber optic cables are REQUIRED to be installed in conduit, when crossing this major type of infrastructure. 

What are Railroads?

Rule 224A of the NESC specifies that:
"Supply and communication lines crossing railroads, or similar locations shall be designed to withstand anticipated mechanical loads and must be installed in suitably protected casings to protect against mechanical damage."

400

In February of this year, ECC broke ground for the first time in this major city also known for its surprising lack of clocks.

What is Las Vegas?

400

This hazardous material is formed by cutting concrete or other like substances when water suppression methods are not used

What is silica dust?

400
Typically used to measure sound and electrical signals, this unit of measurement is also used to measure the loss of signal in fiber optic networks.

What is dB (decibels)?

500

ECC’s official stop-work authority policy allows this person to stop work for safety concerns.

Who is any employee?

500

Clearance over swimming pools for communication lines must be at least this distance. (trick question)

What is 0 feet?

Rule 234C of the NESC specifies that:

"No part of a service drop or any communication line shall be located directly over/or under a swimming pool or the area extending 10 feet horizontally from the edge of the pool." 

500

ECC's first purchase of this type of equipment in 1996 began a new branch of construction for the organization.

What is a directional drill?

500

This weather-related condition can cause dizziness, nausea, and confusion.

What is heat exhaustion?

500

In 1984 the TIA/EIA color code was introduced to the fiber optic industry. These two colors have since signified the first and last fiber in a tube or ribbon

What is Blue & Auqa?

Blue, Orange, Green, Brown, Slate, White, Red, Black, Yellow, Violet,   Rose, Aqua