EDP Phase Framework
Constraints vs. Criteria
Failure Analysis & RCA
Destructive Testing & Factor of Safety
Notebooks & Legal IP
100

Identifying project constraints and target audience budget occurs in which EDP phase?

Phase 1 (Problem Definition & Conceptualization)

100

A rule stating that a prototype must cost less than $20 is a ______.

Constraint (limit on resources)

100

An unbraced vertical leg bends outward under heavy weight. What failure mode is this?

Structural Geometry Buckling

100

What type of testing involves pushing a model until it breaks?

Destructive Testing

100

What binding type is legally required for an engineering notebook used in patent court?

Permanently Bound (stitched/perfect) Binding

*Loose-leaf is Legally Voided!

200

Building a preliminary index card bridge model takes place in which stage and phase?

Phase 2, Stage 4 (Build Prototype)

200

A statement that a bridge "must hold at least 500g for 10 seconds" is a ______. 

Criteria (goal/requirement the solution must achieve)

200

What is the primary difference between a failure symptom and a root cause?

A symptom is the visible outcome (i.e., deck folding), while the root cause is the underlying physical mechanism (i.e., tension shear at the joint)

200

Why do engineers perform destructive testing on cheap models in a lab?

To discover exact failure limits safely without financial loss or human safety risks

200

How must an error be corrected in an official engineering notebook?

A Single-line Strikethrough, Initialed, and Dated 

*(No Erasing or White-out)

300

What happens during Phase 3, Stage 6 of the EDP?

Iterate & Refine (modifying geometry/materials based on test failure points)

300

*Give an example of an environmental constraint in an engineering project.

*Using only 100% recyclable paper or limiting carbon emissions during manufacturing

*Answers may vary!*

300

What does RCA stand for, and what is its main goal?

Root Cause Analysis; Goal: Finding out why a system failed rather than just what failed

300

The Factor of Safety (FoS) value always be greater than _____ to avoid structural yielding.

1.0

300

What should an engineer draw across unused blank space on a notebook page?

A diagonal line or "X" 

*To prevent retroactive additions

400

Why is the EDP called an "iterative cycle" rather than a linear process?

Testing reveals failure data that forces engineers to loop back and modify earlier steps

400

If a team runs out of tape during a challenge, what constraint did they exceed?

Material Constraint

400

Why does re-folding paper fail to fix a bridge if the tape joint was separated?

Re-folding treats a paper symptom without addressing the joint shear root cause

400

If a bridge is designed for 100 lbs but holds up to 300 lbs before snapping, what is its Factor of Safety?

*Hint: FoS = Max Stress/Design Stress

FoS = 3.0 

*FoS = (300/100)

400

What does "Reduction to Practice" mean in intellectual property law?

Physically proving an invention works by building and testing a functional prototype

500

True or False: Constructing a scale prototype occurs before selecting a design matrix option. (Explain)

False - Conceptualization/Selection (Stage 3) comes before Building (Stage 4)

500

Explain how a project requirement can become a constraint.

When strict requirements limit the choices, budget, or materials available to the engineer

500

In a C-E-R response, what evidence should be included regarding a structural failure?

Specific quantitative load numbers and exact qualitative observations of the break point

500

Name two factors that influence the Factor of Safety chosen by an engineer.

Material Type (i.e., Brittle vs. Ductile), Load Predictability (i.e., Static vs. Dynamic loads), and Consequences of Failure (i.e., Human Life)

500

Why is a non-inventor witness signature required on an engineering notebook page?

To provide independent third-party proof that the work was disclosed and understood on that date