Acronyms
Quality Assurance
Non Destructive Testing
Finance
PPB&E
100

CAQAP

Contract Administration Quality Assurance Program

100

How many CAR types are there and which one can be authorized by the Dept Head?


There are 4 Methods (A,B,C,D).

Method C is authorized by the Dept Head

100

What is NDT?

The use of noninvasive techniques to determine the integrity of a material, component or structure.

100

What is the Navy Working Capital Fund?

A revolving fund that acts as working capital to finance the operation of NWCF activities.

100

What does PPB&E stand for?

Planning, Programming, Budgeting & Execution

200

TIG

Tungsten Inert-Gas

200

When does welding slag pose a threat?

Slag material poses a threat to the structural integrity of a weld if welding onto something that was previously welded.

200

Name the 6 methods of NDT.

Which one is the most expensive?

1. Visual Testing   (VT)

2. Liquid-Penetrant Testing  (PT)

3. Magnetic-Particle Testing  (MT)

4. Ultrasonic Testing  (UT)

5. Eddy-Current Testing  (ET)

6. Radiographic Testing   (RT)


Radiographic Testing is the most expensive.

200

What is the funding category for Ship Repair?

1B4B

200

What does the Program Objective Memorandum (POM) do.

-Documents fiscal requirements based on service requirements from the planning phase.

-Consists of a plan to allocate resources.

300

OWLD

Obligation Work Limiting Date

300

What four factors play a part in choosing weld joints?

Type of weld joints depends on application, construction, use and location accessibility.

300

Why is the Eddy Current test used?

It is utilized to detect surface cracks but can also be used to measure electrical conductivity and coating thickness.

300

Define Outlay.

Occurs when the vendor cashes the expenditure check and money flows from the Treasury to the vendor or supplier.

300

Name the 5 Key Phase Planning Documents.

-NSS:  National Security Strategy  (From the President)

-NDS:  National Defense Strategy  (From the Secretary of Defense)

-NMS:  National Military Strategy  (From the Joint Chiefs of Staff)

-CPR:  Chairman’s Program Recommendation   (From the Chairman of the JCS)

DPG:  Defense Planning Guidance(Signed by the SECDEF)

400

FIAR

Financial Improvement Audit Readiness

400

Name all 7 elements of CAQAP

-Planning

-Document Review

-Procedure Evaluation

-Product Verification Inspection

-Corrective Action

-Quality Data Evaluation

-Process Quality Audits

400

Name the 4 different test methods of the Ultrasonic Test.

1. Thickness testing

2. Silver braze testing

3. Shear wave testing

4. Character and Sizing testing

400

What is the Appropriation Life Cycle?

-Current (Obligation Window) 

------1-5 years

------Available for new obligations and expenditures. 

-Expired (Expenditure Window)

-------5 years

-------No new obligations

------Available for obligation adjustments and expenditures only

-Closed

------No longer available for obligation adjustments or expenditures.

-----Have to use current year $ to pay

400

In which phase are the costs identified for the project?

The Programming Phase. 

500

CICA

Competition In Contracting Act

500

Name the 5 types of welding.

-Gas welding

-Resistance welding

-Arc welding

-New Age welding

-Solid State welding

500

Name one con about the Magnetic Particle Test.

The MT cannot see deep internal defects.

500

Name the exceptions to the Full Funding policy.

Exceptions to full funding include Long Lead Time Material (LLMT) and multi-year procurements

500

Recite the flow of the Bottom- Up POM submission.

Program-> Resource Sponsor-> OPNAV ->DON -> OSD -> OMB