PPE
Injuries
Chemical & Spill response
Contractor Safety
WasteWater
100

What does PPE stand for?

Personal Protective Equipment

100

How many first aids do we have YTD?

25
100

How many CO2 monitors do we have in production?

2

100

Contractors must be approved in _____ to be able to perform work on site?

ISN

100

What percentage can the EQ tank hit before we shut down?

65%

200

What must you wear when entering a production area?

Hairnet, Beard net, Ear plugs, Vest, Safety glasses and Safety shoes

200

How many recordables do we have YTD?

5

200

How long can hazardous waste be stored on site?

180 Days 

200

Name 2 high risk permits we provide for contractors

Hot work, Line breaking, Confined spaces, Working at heights, Fire suppression, Live electrical, Energy Control.  

200

What is our daily goal for WUR?

1.33

300

Who is our approved PPE vendor?

Grainger 

300

What is our most common factor of injuries YTD?

Slips, Trip & Falls & Ergo

300

How long can universal waste be stored on site?

1 Year

300

What amount of time must a hot work be evaluated after completing the work to ensure no fire arises?

60 Mins - 3 Hours

300

How many PH probes do we have?

7

400

How man AED'S are on site?

2

400

What 3 things are needed for an injury report?

EHS Alert, Statement of facts, Job Hurt report 

400

True or False: Used absorbents are considered Haz waste?

True

400

How often must contractors go through general safety awareness training?

1 year 

400

What is our daily flow limit?

110,000 Gallons

500

What PPE is required when operating a boom lift ?

Harness, Hardhat  

500

What's our RIR YTD?

2.0
500

Where do we store our used hazardous chemicals? 

Haz waste shed

500

What grade must contractors have in ISN to work on site?

A or B

500

What are our PH limits for WasteWater?

5.0 - 11.5