Introductions / Permits
Timelines
Installation / Final Inspections
Electrical 101
Other
100

In CA we are not required to have _____  PRIOR to installation in most jurisdictions.

What is a utility approval?

100

This is the very first step once a customer signs documents with us.

What is site survey?

100

True or False. We can install most homes without HOA approval in TX.

What is False. 

100

This state we do not need a shut off date for derates.

What is Nevada?

100

This is where we send a call from an agency trying to verify one of our employees employment. 

200

A customer has major electrical work i.e derate / MPU this is the typical timeline we provide in the intro email.

What is 4-6 Months ?

200

For GoodLeap  a customer starts making payments  __ days after instalaliton.

What is 60 days after installation?

200

When creating a case for roof tiles what would the Pre-A Type would be this. 

What is Install Issues 

200

Energy comes from this.

What is overhead and underground

200

I got an email from a customer on my personal email and replied. AFter replying this is my next step. 

What is log the email ?

300

AHJ stands for this. 

What is jurisdiction (authority having jurisdiction)?

300

THis is the CA deadline to be grandfathered into NEM 2.0.

What is 4/14 (today)?

300

After installation the installers leave this at the residence for next steps.

What is the planset 

300

This makes up a main service panel.

What is a utility meter, main breaker, bussing, and branch circuits?

300

When creating an activation case we collect this for each system.

What is wifi // day the customer is avail 

400

In Arizona these jurisdictions do not need a permit as long as it is a regular solar project.

What is Mesa and Gilbert? 

400

This is when a customer expect higher energy bills once activated.

What is in the summer?

400

This must be done after installation prior to final inspection. 

What is installation QA/QC? 

400

This is the definition of a derate

When you downsize the main breaker to create more ampacity for a solar back feed breaker.

400

Define ampacity.

What is the electrical load? 

500

One of these counties in CA that does require a utility application approval PRIOR to install?.

What is Ventura ?

500

This is the average is the timeline for a MPU.

What is 60-90 days 

500

In the state of Arizona this utility company requires the system to be on to grant PTO.

What is MEC?

500

THis is the 120% rule.

What is the rule that makes certain that the main service panel installed on the home is capable of handling the maximum amount of utility and solar (+storage) power to the home at the same time.  (Assume draw from utility & solar are doubling up.)

500

This is the year was the first silicon solar cell was produced.

What is 1954?