This is the non-profit entity that acts as a clearing house for suppliers and generators in New York State. It ensures reliability of the grid.

What is the NYISO?

100

This is the pricing point for Natural Gas futures contracts.

What is Henry Hub?

100

This serves to maintain reliability of the bulk power system by procuring sufficient resource capability to meet expected maximum energy needs.

What is Installed Capacity (ICAP)?

100

This is a power plant that is called to produce during times when the grid is experiencing the most stress.  They are expensive to run and may only have to be utilized a couple times a year.

What is a Peaking Power Plant?

200

This is calculated for a consumer based on 100% kWh consumption over peak KW during a billing period.

What is Load Factor?

200

This reflects the difference between the price of natural gas at Henry Hub and the price at another delivery point elsewhere.

What is the basis?

200

This type of metered consumer may be able to decrease their capacity obligation for the next year by curtailing during a identified peak event

What is interval metered?

200

This is the cheapest form of renewable energy to utilize

What is low impact hydro?

300

This is a charge added to consumers' bills to compensate for the subsidy given to nuclear power plants to keep them running.

What is the ZECs?

300

In New York State this is a period of time between November and March when natural gas is taken out of storage for use

What is withdrawal season?

300

This is what capacity charges are based on and measured by for the following year

What is the peak load contribution (PLC)?

300

This type of power plant bids in at $0 in the bid stack since it needs to be running constantly and is expensive to shut down

What is a nuclear power plant?

400

The New York Independent System Operator (NYISO) determines this through demand forecasting and generator bidding processes.

What is the Locational Based Marginal Price (LBMP)?
400

This is the delivery point at which the end user uses the natural gas

What is burner tip?

400

This represents the percentage of ICAP available after a unit's forced outage rate is taken into account.

What is Unforced Capacity (UCAP)?

400

These plants are being phased out or switching to dual fuel because of their environmental impact.

What are coal plants?

500

This is a change in the power consumption of an electric utility customer to better match the demand for power with the supply to better stabilize the grid during peak days.

What is Demand Response?

500

This is a condensed form of Natural Gas for exportation.

What is Liquid Natural Gas (LNG)?

500

This capacity zone was implemented by FERC May of 2014 to attract new power generation in the area and address supply shortfalls

What is the Lower Hudson Valley Capacity Zone?

500

This is a 2000 MW Nuclear Plant that shut down this year and was replaced with Natural Gas Generating Plants

What is Indian Point?